15 facilities · 12 operators · 11 MW tracked
Colocation in Czech Republic: pricing, providers and markets
12 operators run 15 tracked data centers in Czech Republic across 1 cities with at least three sites (15 operational, 11+ MW published, 0 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Czech Republic?
12 operators run 15 tracked data centers in Czech Republic; the largest by sites is AKESO Holding (2). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Czech Republic publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Czech Republic
Operators with tracked data centers in Czech Republic, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| AKESO Holding | 2 / 2 | not published | AKESO DC Beroun (Case15) | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier IV Certification of Design Documents | — |
| Master Internet | 2 / 2 | not published | MasterDC Prague | not published | — |
| O2 Czech Republic | 2 / 2 | not published | O2 Datové Centrum Chodov | Uptime Institute Tier III Certification of Design Documents | — |
| TTC Teleport | 1 / 1 | 6 | TTC Teleport DC2 | not published | — |
| CE Colo | 1 / 1 | 3 | CE Colo DC1 | ISO 9001:2015, ISO 14001:2015, ISO 27001:2022 | — |
| Casablanca INT | 1 / 1 | 2 | Casablanca INT Data Centre | not published | — |
| České Radiokomunikace | 1 / 1 | not published | DC Tower (České Radiokomunikace) | not published | — |
| CETIN | 1 / 1 | not published | CETIN HC TKB Hradec Králové | Uptime Institute Tier III Certification of Design Documents | — |
| COOLHOUSING | 1 / 1 | not published | COOLHOUSING | not published | — |
| DataSpring (KKCG Group) | 1 / 1 | not published | DataSpring Lužice Data Center | Uptime Institute Tier III Certification of Design Documents | — |
| SafeDX | 1 / 1 | not published | SafeDX Server Hotel | ISO/IEC 27001:2022, ISO/IEC 27017:2015 | — |
| T-Mobile Czech Republic | 1 / 1 | not published | T-Mobile DC7 | ANSI/TIA-942-A Rating 3, ISO 27001:2013 | — |
Colocation markets in Czech Republic
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Prague | 10 | 11 |
Availability in Czech Republic: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Czech Republic?
By tracked sites: AKESO Holding with 2. By published IT capacity: TTC Teleport with 6 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Czech Republic, including some that do not sell space.
Is there colocation capacity available in Czech Republic right now?
Coloprice tracks 15 facilities here (15 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Czech Republic?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Czech Republic
One brief, several operators with capacity in Czech Republic, same terms. Independent — no operator pays for position.
Colocation in Czech Republic? One brief, several quotes.
Request quotes →