▮▮Coloprice

18 facilities · 11 operators · 13 MW tracked

Colocation in Riga: pricing, providers and capacity

11 operators run 18 tracked data centers in Riga (18 operational, 13+ MW published, 1 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.

How much does colocation cost in Riga?

11 operators run 18 tracked data centers in Riga; the largest by sites is Tet (6). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Riga publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Riga

Operators with tracked data centers in Riga, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Tet6 / 6not publishedTet Dattum Data CenterPCI DSS Level 1, ISO 27001, Uptime Institute Tier III Certification of Design Documents—
Delska3 / 313Delska EU North Riga LV DC1Uptime Institute Tier III Certification of Design Documents, LEED, ISO/IEC 27001:20221
Baltcom1 / 1not publishedBaltcom Data CenterISO 9001:2000—
Bite Latvija1 / 1not publishedBite One IT Data Centernot published—
CloudHosting SIA1 / 1not publishedCloudHosting Data Centernot published—
Lattelecom1 / 1not publishedLattelecom Dattum Data CenterUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
LUMII1 / 1not publishedSigmanet Data Centrenot published—
LVRTC1 / 1not publishedLVRTC Datu CentrsBuilt to EN 50600 availability class 2/3—
RETN1 / 1not publishedRETN AD DCnot published—
Santa Monica Networks1 / 1not publishedPerses 2 - Riganot published—
VERSIJA Ltd.1 / 1not publishedVERnet DCnot published—

Availability in Riga: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Riga?

By tracked sites: Tet with 6. By published IT capacity: Delska with 13 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Riga, including some that do not sell space.

Is there colocation capacity available in Riga right now?

Coloprice tracks 18 facilities here (18 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Riga?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Riga

One brief, several operators with capacity in Riga, Latvia, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.