1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Las Toninas: 1 facilities, colocation pricing
How many data centers are in Las Toninas?
Coloprice tracks 1 data centers in Las Toninas, Argentina: 1 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.092
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Las Toninas, Argentina | · · · | $0.092 | 1 | — |
| Chile | $200 | $0.212 | 52 | — |
| Brazil | $160 | $0.152 | 244 | — |
| Peru | · · · | $0.167 | 38 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Las Toninas?
Coloprice tracks 1 data centers in Las Toninas, Argentina: 1 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Las Toninas?
By number of facilities tracked: Telefonica de Argentina (1).
How much does colocation cost in Las Toninas, Argentina?
No published wholesale $/kW benchmark exists for Las Toninas, Argentina yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Las Toninas, Argentina?
Commercial electricity in Las Toninas, Argentina is $0.092 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Las Toninas, Argentina?
Las Toninas, Argentina sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Las Toninas, Argentina market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Las Toninas, Argentina Cable landing station | Telefonica de Argentina | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Las Toninas: free, reply within one business day
Get Quotes →