Data Center Colocation Costs in Bermuda: Q3 2026 Price Index

Compare 1 data centers in Bermuda across 1 operators: capacity, status, certifications, facilities and colocation pricing context.

1 facilities1 operators

Colocation pricing: Bermuda & other markets — The Colocation Price Index →

Data centers

FacilityOperatorCountryCityCerts ⓘStatus
Fort Knox BermudaFort Knox Bermuda LtdBermudaHamilton———data pendingOperational
All 1 facilities, A–Z

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.253

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Bermuda· · ·$0.2531—
Bahamas· · ·$0.3452—
United States$196$0.1171332—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Bermuda's sole catalogued facility is Fort Knox Bermuda, a colocation operator running its service since 1999 inside a converted former US Navy avionics building the operator describes as built to US military Class 5 standards, with on-site diesel backup power, redundant cooling and 24/7 monitoring. No street address for the data-center building itself is published, and no power or third-party tier certification figures are disclosed. GlobalPetrolPrices puts December 2025 business electricity at $0.253/kWh; Bermuda's isolated island grid runs on imported fuel, which is why on-site generator backup, not grid reliability, anchors the operator's pitch.

Frequently asked questions

How much does colocation cost in Bermuda?

No published wholesale $/kW benchmark exists for Bermuda yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Bermuda?

Commercial electricity in Bermuda is $0.253 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Bermuda?

On power alone, United States ($0.117/kWh) run below Bermuda. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Bermuda market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Bermuda?

Coloprice tracks 1 data centers in Bermuda: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.