▮▮Coloprice
← All countries

1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Bosnia and Herzegovina: Q3 2026 Price Index

Compare 1 data centers in Bosnia and Herzegovina across 1 operators: capacity, status, certifications, facilities and colocation pricing context.

1 facilities1 operators

Colocation pricing: Bosnia and Herzegovina & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.135

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Bosnia and Herzegovina· · ·$0.1351
Croatia· · ·$0.1841
Serbia· · ·$0.1552

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Bosnia and Herzegovina's catalog entry is Akton Data Center Sarajevo, a carrier-neutral colocation facility inside the Unitic business center, part of Akton Communications and Networks' wider Adriatic-region network of data centers spanning Slovenia, Croatia, Serbia, North Macedonia, Bosnia and Montenegro. The operator does not publish IT power capacity, floor area or rack count, and no Uptime Institute or TIA-942 award appears on record for the site. Business electricity runs $0.135/kWh (GlobalPetrolPrices, Dec 2025), among the lower rates in the Balkans, reflecting a coal- and hydro-heavy domestic generation mix. As with several of its Balkan neighbors now entering the catalog, Bosnia and Herzegovina's disclosed colocation market consists of a single regional operator's local presence rather than an independent or hyperscale-linked site, leaving substantial headroom for future capacity disclosures as the wider region's market matures.

Frequently asked questions

How much does colocation cost in Bosnia and Herzegovina?

No published wholesale $/kW benchmark exists for Bosnia and Herzegovina yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Bosnia and Herzegovina?

Commercial electricity in Bosnia and Herzegovina is $0.135 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Bosnia and Herzegovina?

Bosnia and Herzegovina sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Bosnia and Herzegovina market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Bosnia and Herzegovina?

Coloprice tracks 1 data centers in Bosnia and Herzegovina: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Akton Data Center SarajevoAkton Communications and NetworksBosnia and HerzegovinaSarajevo9·Operational