Data centers in Curitiba: 6 facilities, colocation pricing
Colocation pricing and providers in Curitiba →
How many data centers are in Curitiba?
Coloprice tracks 6 data centers in Curitiba, Brazil: 6 operational, 0 under construction and 0 announced, run by 6 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.152
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 2+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Curitiba, Brazil | · · · | $0.152 | 6 | — |
| Mexico | $260 | $0.241 | 72 | — |
| Chile | $200 | $0.212 | 54 | — |
| Colombia | $190 | $0.276 | 45 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Curitiba?
Coloprice tracks 6 data centers in Curitiba, Brazil: 6 operational, 0 under construction and 0 announced, run by 6 operators.
Which operators run data centers in Curitiba?
By number of facilities tracked: Elea Data Centers (1), Cirion Technologies (1), NextStream (1), Governo do Estado do Parana (1), ETH TELECOM (1).
What is the total data center power capacity in Curitiba?
Facilities that publish capacity add up to 2 MW (2 of 6 sites disclose a figure); the largest published site is Elea CTA1 with 1.7 MW.
How much does colocation cost in Curitiba, Brazil?
No published wholesale $/kW benchmark exists for Curitiba, Brazil yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 6 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Curitiba, Brazil?
Commercial electricity in Curitiba, Brazil is $0.152 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 6 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Curitiba, Brazil?
Curitiba, Brazil sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Curitiba, Brazil market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Elea CTA1 | Elea Data Centers | 1.7 | — | Operational |
| Cirion Curitiba (CUR1) | Cirion Technologies | — | — | Operational |
| Curitiba Data Center | NextStream | 0.7 | — | Operational |
| Governo do Estado do Parana CELEPAR Data Center | Governo do Estado do Parana | — | III | Operational |
| ETH TELECOM Curitiba | ETH TELECOM | — | — | Operational |
| PIX DBUG | Hoinaski & Sklasky Ltda | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.