▮▮Coloprice
← Brazil

6 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Curitiba: 6 facilities, colocation pricing

Colocation pricing and providers in Curitiba →

How many data centers are in Curitiba?

Coloprice tracks 6 data centers in Curitiba, Brazil: 6 operational, 0 under construction and 0 announced, run by 6 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.152

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 2+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Curitiba, Brazil· · ·$0.1526—
Mexico$260$0.24172—
Chile$200$0.21254—
Colombia$190$0.27645—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Curitiba?

Coloprice tracks 6 data centers in Curitiba, Brazil: 6 operational, 0 under construction and 0 announced, run by 6 operators.

Which operators run data centers in Curitiba?

By number of facilities tracked: Elea Data Centers (1), Cirion Technologies (1), NextStream (1), Governo do Estado do Parana (1), ETH TELECOM (1).

What is the total data center power capacity in Curitiba?

Facilities that publish capacity add up to 2 MW (2 of 6 sites disclose a figure); the largest published site is Elea CTA1 with 1.7 MW.

How much does colocation cost in Curitiba, Brazil?

No published wholesale $/kW benchmark exists for Curitiba, Brazil yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 6 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Curitiba, Brazil?

Commercial electricity in Curitiba, Brazil is $0.152 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 6 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Curitiba, Brazil?

Curitiba, Brazil sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Curitiba, Brazil market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
Elea CTA1Elea Data Centers1.7—Operational
Cirion Curitiba (CUR1)Cirion Technologies——Operational
Curitiba Data CenterNextStream0.7—Operational
Governo do Estado do Parana CELEPAR Data CenterGoverno do Estado do Parana—IIIOperational
ETH TELECOM CuritibaETH TELECOM——Operational
PIX DBUGHoinaski & Sklasky Ltda——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.