9 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Porto Alegre: 9 facilities, colocation pricing
Colocation pricing and providers in Porto Alegre →
How many data centers are in Porto Alegre?
Coloprice tracks 9 data centers in Porto Alegre, Brazil: 8 operational, 1 under construction and 0 announced, run by 8 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.152
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 28+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Porto Alegre, Brazil | · · · | $0.152 | 9 | — |
| Mexico | $260 | $0.241 | 72 | — |
| Chile | $200 | $0.212 | 54 | — |
| Colombia | $190 | $0.276 | 45 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Porto Alegre?
Coloprice tracks 9 data centers in Porto Alegre, Brazil: 8 operational, 1 under construction and 0 announced, run by 8 operators.
Which operators run data centers in Porto Alegre?
By number of facilities tracked: Elea Data Centers (2), Scala Data Centers (1), Tecto Data Centers (1), Cirion Technologies (1), Adylnet Telecom (1).
What is the total data center power capacity in Porto Alegre?
Facilities that publish capacity add up to 28 MW (4 of 9 sites disclose a figure); the largest published site is Tecto TPOA1 (Porto Alegre, under construction) with 20 MW.
How much does colocation cost in Porto Alegre, Brazil?
No published wholesale $/kW benchmark exists for Porto Alegre, Brazil yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 9 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Porto Alegre, Brazil?
Commercial electricity in Porto Alegre, Brazil is $0.152 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 9 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Porto Alegre, Brazil?
Porto Alegre, Brazil sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Porto Alegre, Brazil market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Scala SPOAPA01 | Scala Data Centers | 4.8 | — | Operational |
| Elea POA1 | Elea Data Centers | 1.5 | — | Operational |
| Elea POA2 | Elea Data Centers | 2 | — | Operational |
| Tecto TPOA1 (Porto Alegre, under construction) | Tecto Data Centers | 20 | — | Under construction |
| Cirion Porto Alegre | Cirion Technologies | — | — | Operational |
| Adylnet Telecom - Porto Alegre | Adylnet Telecom | — | — | Operational |
| SouthTech Telecom - Porto Alegre | Vogel Soluções em Telecom e Informática S/A | — | — | Operational |
| BR.Digital Porto Alegre (PAE1) | BR.Digital | — | — | Operational |
| PIX Nossa Telecom PAE | Nossa Telecom Telecomunicações Ltda | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Brazil
Colocation quotes in Porto Alegre: free, reply within one business day
Get Quotes →