10 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Guatemala: Q3 2026 Price Index
Compare 10 data centers in Guatemala across 7 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Guatemala & other markets — The Colocation Price Index → · Best data centers in Guatemala → · Data center companies in Guatemala · Colocation pricing and providers in Guatemala →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| KIO GTM|1 | KIO Networks | Guatemala | Mixco | — | IV | — | data pending | Operational |
| Centro de Datos BOSS GTQZ01 | Back Office Smart Solution, S.A. (BOSS) | Guatemala | Quetzaltenango | — | III | — | data pending | Operational |
| Data Center Zona Pradera, Fase 1 | GBM de Guatemala, S.A. | Guatemala | Guatemala City | — | III | — | data pending | Operational |
| Orión Data Center | IFX Networks | Guatemala | Mixco | — | III | — | 32E | Operational |
| Centro de Datos BOSS GTGU01 | Back Office Smart Solution, S.A. (BOSS) | Guatemala | Guatemala City | — | III | — | data pending | Operational |
| Emerging Networks Guatemala Datacenter Orión | Emerging Networks Guatemala | Guatemala | Ciudad de Guatemala | — | III | — | data pending | Operational |
| GBM de Guatemala Data Center Zona Pradera, Fase 1 | GBM de Guatemala, S.A. | Guatemala | ciudad-de-guatemala | — | III | — | data pending | Operational |
| Fraijanes II Data Center | Tigo Guatemala (Millicom) | Guatemala | Fraijanes | — | III | — | data pending | Operational |
| Claro El Zapote Data Processing Center | Telecomunicaciones de Guatemala, S.A. (Claro Guatemala / América Móvil) | Guatemala | Guatemala City | — | — | ICREA Sello … | data pending | Operational |
| KIO Guatemala 1 (GTM1) | KIO Networks | Guatemala | Guatemala City | — | — | — | data pending | Operational |
Nothing matches the filters
All 10 facilities, A–Z
- Centro de Datos BOSS GTGU01 Guatemala City
- Centro de Datos BOSS GTQZ01 Quetzaltenango
- Claro El Zapote Data Processing Center Guatemala City
- Data Center Zona Pradera, Fase 1 Guatemala City
- Emerging Networks Guatemala Datacenter Orión Ciudad de Guatemala
- Fraijanes II Data Center Fraijanes
- GBM de Guatemala Data Center Zona Pradera, Fase 1 ciudad-de-guatemala
- KIO GTM|1 Mixco
- KIO Guatemala 1 (GTM1) Guatemala City
- Orión Data Center Mixco
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.198
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 8 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Guatemala | · · · | $0.198 | 10 | — |
| Mexico | $260 | $0.241 | 72 | — |
| El Salvador | · · · | $0.240 | 3 | — |
| Honduras | · · · | $0.186 | 5 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Guatemala's catalog now spans six Uptime Institute-certified sites across two cities. KIO Networks' GTM|1 in Mixco (Tier IV Design) and Tigo Guatemala's Fraijanes II (Tier III Design) remain the two telecom-adjacent anchors. IFX Networks added a third commercial operator with Orión, a $25M, ~5,000 sqm facility in Mixco's Naranjo district (Tier III Design), while BOSS (Back Office Smart Solution) runs two certified sites — GTGU01 in Guatemala City and GTQZ01 in Quetzaltenango, the country's second-largest city and the only certified facility disclosed outside the capital, with Gold-level operational sustainability. GBM de Guatemala's Zona Pradera facility, in a Zona 10 business park, rounds out the capital's cluster. None of the six operators discloses IT power capacity. Business electricity runs $0.198/kWh (GlobalPetrolPrices, Dec 2025), from a hydro, biomass-cogeneration and thermal mix distributed across several private utilities. Guatemala's data-center footprint remains capital-centric, with Quetzaltenango now the sole outlying market.
Frequently asked questions
How much does colocation cost in Guatemala?
No published wholesale $/kW benchmark exists for Guatemala yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 10 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Guatemala?
Commercial electricity in Guatemala is $0.198 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 10 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Guatemala?
On power alone, Honduras ($0.186/kWh) run below Guatemala. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Guatemala market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Guatemala?
Coloprice tracks 10 data centers in Guatemala: 10 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →