12 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in San José: 12 facilities, colocation pricing
Colocation pricing and providers in San José →
How many data centers are in San José?
Coloprice tracks 12 data centers in San José, Costa Rica: 12 operational, 0 under construction and 0 announced, run by 10 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.255
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 8 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| San José, Costa Rica | · · · | $0.255 | 12 | — |
| Panama | · · · | $0.222 | 14 | — |
| Guatemala | · · · | $0.198 | 10 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in San José?
Coloprice tracks 12 data centers in San José, Costa Rica: 12 operational, 0 under construction and 0 announced, run by 10 operators.
Which operators run data centers in San José?
By number of facilities tracked: IFX Networks (2), Navégalo (2), Critical Colocation, S.A. (1), Liberty Costa Rica (1), GBM de Costa Rica, S.A. (1).
How much does colocation cost in San José, Costa Rica?
No published wholesale $/kW benchmark exists for San José, Costa Rica yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 12 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in San José, Costa Rica?
Commercial electricity in San José, Costa Rica is $0.255 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 12 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near San José, Costa Rica?
On power alone, Panama ($0.222/kWh), Guatemala ($0.198/kWh) run below San José, Costa Rica. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full San José, Costa Rica market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| CODISA Data Center II | IFX Networks | — | III | Operational |
| Navégalo DC-CR2 | Navégalo | — | III | Operational |
| Sede CR-SJO Data Center | Critical Colocation, S.A. | — | III | Operational |
| Data Center Tiribí | Liberty Costa Rica | — | III | Operational |
| NAP de Centroamérica | IFX Networks | — | III | Operational |
| GBM de Costa Rica Data Center | GBM de Costa Rica, S.A. | — | — | Operational |
| Navégalo DC-CR1 | Navégalo | — | — | Operational |
| Centro de Procesamiento de Datos Principal de Banco Popular | Banco Popular y de Desarrollo Comunal | — | III | Operational |
| Ideas Gloris CODISA Data Center - II | Ideas Gloris | — | III | Operational |
| CODISA Data Center – Edificio 2 – Suite A / Suite D / Suite I | Codisa Data Center (Ideas Gloris S.A.) | — | 3 | Operational |
| Rack Lodge Data Center | Rack Lodge Data Center | — | — | Operational |
| CRIX | CRIX | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in San José: free, reply within one business day
Get Quotes →