How many data centers are in San José?

Coloprice tracks 12 data centers in San José, Costa Rica: 12 operational, 0 under construction and 0 announced, run by 10 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.255

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 8 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
San José, Costa Rica· · ·$0.25512—
Panama· · ·$0.22214—
Guatemala· · ·$0.19810—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in San José?

Coloprice tracks 12 data centers in San José, Costa Rica: 12 operational, 0 under construction and 0 announced, run by 10 operators.

Which operators run data centers in San José?

By number of facilities tracked: IFX Networks (2), Navégalo (2), Critical Colocation, S.A. (1), Liberty Costa Rica (1), GBM de Costa Rica, S.A. (1).

How much does colocation cost in San José, Costa Rica?

No published wholesale $/kW benchmark exists for San José, Costa Rica yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 12 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in San José, Costa Rica?

Commercial electricity in San José, Costa Rica is $0.255 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 12 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near San José, Costa Rica?

On power alone, Panama ($0.222/kWh), Guatemala ($0.198/kWh) run below San José, Costa Rica. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full San José, Costa Rica market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
CODISA Data Center IIIFX Networks—IIIOperational
Navégalo DC-CR2Navégalo—IIIOperational
Sede CR-SJO Data CenterCritical Colocation, S.A.—IIIOperational
Data Center TiribíLiberty Costa Rica—IIIOperational
NAP de CentroaméricaIFX Networks—IIIOperational
GBM de Costa Rica Data CenterGBM de Costa Rica, S.A.——Operational
Navégalo DC-CR1Navégalo——Operational
Centro de Procesamiento de Datos Principal de Banco PopularBanco Popular y de Desarrollo Comunal—IIIOperational
Ideas Gloris CODISA Data Center - IIIdeas Gloris—IIIOperational
CODISA Data Center – Edificio 2 – Suite A / Suite D / Suite ICodisa Data Center (Ideas Gloris S.A.)—3Operational
Rack Lodge Data CenterRack Lodge Data Center——Operational
CRIXCRIX——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Nearby data center markets