Verne — The Air
OperationalMittalinja 1, FI-01260 Vantaa, Finland
Verne — The Air is a data center in Vantaa, Finland, operated by Verne, with 70 MW of published IT capacity, currently operational.
Verne's Vantaa campus (formerly Ficolo), a 15,000 sqm data center on 100% renewable power with waste heat piped to district heating; expansion with two new buildings is planned for 2027.

- Operator
- Verne
- City
- Vantaa, Finland
- Power, MW
- 70 MW
- Cooling
- Air
- Floor space
- 15,000 m²
- AI-ready
- Yes
Coloprice Score
29 out of 100
Class E · #9 of 15 in Finland
- Resilience0/35
- Compliance0/20
- Transparency9/20
- Scale13/15
- Maturity7/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Verne's campus in Vantaa, just outside Helsinki, began life as a Ficolo project announced in 2017 with an initial roughly EUR 50 million investment; Ficolo was rebranded to Verne in 2022 after acquisition by Digital 9 Infrastructure, and Verne itself was acquired by investment firm Ardian in 2024. The existing campus covers about 15,000 sqm, and Verne states current site capacity at 70 MW. In 2025 the operator announced a further expansion, acquiring adjacent land from Onvest to add two new buildings targeted for a 2027 launch, with the new construction designed to support liquid cooling for high-density AI and HPC workloads alongside the existing air-cooled halls. The site runs on 100% renewable electricity and, in common with other Helsinki-area operators, feeds recovered waste heat into the district heating network. Verne markets the Vantaa campus as one of the larger independent (non-hyperscaler-owned) data center sites in Finland, distinct from Google's company-operated Hamina facility elsewhere in the country.
- ▮15,000 sqm existing campus, 70 MW site capacity
- ▮Formerly Ficolo; rebranded Verne 2022, acquired by Ardian 2024
- ▮Two new buildings planned for 2027, liquid-cooling capable
- ▮100% renewable power, waste heat to district heating
Colocation pricing: Finland & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Vantaa
Source — Verified against operator sources · data pending on-site verification