LEW Green Data Center Augsburg

Operational

Augsburg-Oberhausen, Germany

LEW Green Data Center Augsburg is a data center in Augsburg, Germany, operated by LEW TelNet, with 2 MW of published IT capacity, currently operational, opened in 2024.

LEW TelNet's Green Data Center in Augsburg-Oberhausen, a phased colocation build with evaporative cooling and rooftop solar; the first two server rooms went live in late 2024.

LEW Green Data Center Augsburg — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
LEW TelNet
City
Augsburg, Germany
Power, MW
2 MW
Cooling
Air
Opened
2024
Floor space
1,900 m²
Racks
600
ISO/IEC 27001DIN EN 50600
D

Coloprice Score

37 out of 100

Class D · #39 of 122 in Germany

  • Resilience0/35
  • Compliance6/20
  • Transparency14/20
  • Scale7/15
  • Maturity10/10
How the score is calculated →
Embed score badge
LEW Green Data Center Augsburg — Coloprice Score 37
<a href="https://coloprice.com/data-centers/germany/augsburg/lew-telnet-augsburg/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/lew-telnet-augsburg.svg"
    alt="LEW Green Data Center Augsburg — Coloprice Score 37" height="64">
</a>

The LEW Green Data Center, built by LEW TelNet — the telecom subsidiary of regional utility Lechwerke AG — in the Oberhausen district of Augsburg, broke ground in August 2023 and brought its first two server rooms online in the second half of 2024. At final build-out the site is planned to reach 1,900 m² of white space across four separate server rooms with capacity for around 600 racks, drawing at least 2 MW. The facility is certified to ISO/IEC 27001 and DIN EN 50600 (availability class 3) by TÜV Süd, with a stated target PUE of 1.2 or below. Cooling relies on evaporative water misting and air-to-air heat exchangers rather than mechanical chillers, waste heat is recovered for district heating, and green roofs and facades are used for passive climate control. Power is drawn from a 2.5 MW rooftop and ground-mounted solar array plus regional hydroelectric supply, and the site won a 2025 Data Center Insider award for "green colocation". LEW does not publish the facility's exact street address or an investment figure.

  • Groundbreaking August 2023, first two server rooms live H2 2024
  • Planned final build: 1,900 m², ~600 racks, ≥2 MW
  • ISO/IEC 27001 and DIN EN 50600 certified by TÜV Süd
  • Evaporative cooling plus waste-heat district heating, target PUE ≤1.2

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification