▮▮Coloprice

NTT Frankfurt 3 Data Center

Operational

NTT Frankfurt 3 Data Center is a data center in Rüsselsheim am Main, Germany, operated by NTT Global Data Centers, with 60.5 MW of published IT capacity, currently operational.

NTT's largest disclosed European data center, in Rüsselsheim am Main near Frankfurt, with a 90 MVA on-site substation feeding 2N UPS and N+1 generator backup.

NTT Frankfurt 3 Data Center — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

8 of 14 fields published · Operator? Add or correct data →

Units
Operator
NTT Global Data Centers
City
Rüsselsheim am Main, Germany
Power, MW
60.5 MW
Cooling
Air
Floor space
28,300 m²
Market benchmark
$250 per kW per month wholesale · Germany
Index rate for the market, not this operator’s price list
Address
Karl-Landsteiner-Ring 4, 65428 Rüsselsheim am Main, Germany · Open in maps ↗

1 sources · data pending on-site verification

E

Coloprice Score

27 out of 100

Class E · #65 of 274 in Germany

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale11/15
  • Maturity7/10
How the score is calculated →
Embed score badge
NTT Frankfurt 3 Data Center — Coloprice Score 27
<a href="https://coloprice.com/data-centers/germany/russelsheim-am-main/ntt-frankfurt-3-russelsheim/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/ntt-frankfurt-3-russelsheim.svg"
    alt="NTT Frankfurt 3 Data Center — Coloprice Score 27" height="64">
</a>

Connectivity: 14 networks and 0 internet exchanges are present in this facility.

NTT Frankfurt 3, in Rüsselsheim am Main just outside Frankfurt, is the operator's largest disclosed data center in Europe by both floor space and power: roughly 28,300 sqm with a 60.5 MW IT load, well ahead of NTT's other German sites (Frankfurt 1, 2 and 4, plus Hamburg 1) and its other EMEA facilities in London, Vienna, Zurich and Madrid. Power runs on 2N UPS with N+1 generator backup, fed by a 90 MVA on-site substation. NTT's page states the facility "holds multiple certifications" without naming them, so specific compliance standards are not published. No renewable-energy percentage or year-opened date is disclosed either. The scale of the site — nearly double the IT load of NTT's next-largest disclosed EMEA facility, London 1 at 32 MW live (64 MW planned) — makes it the flagship of NTT's European data center portfolio as currently documented.

  • ▮NTT's largest disclosed European facility: ~28,300 sqm, 60.5 MW IT load
  • ▮2N UPS, N+1 generator backup, 90 MVA on-site substation
  • ▮Located in Rüsselsheim am Main, outside Frankfurt, alongside NTT's smaller Frankfurt 1/2/4 sites
  • ▮Operator states it "holds multiple certifications" without naming them

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Compare with nearby facilities

FacilityOperatorPower, MWTierStatuskm
NTT Frankfurt 3 Data CenterNTT Global Data Centers60.5—Operational0
China Mobile International - Frankfurt DCChina Mobile International——Operational10
NTT Frankfurt 4 Data CenterNTT Global Data Centers——Operational10
TornadoDC - FRA1Tornado Datacenter GmbH & Co. KG——Operational15
Equinix FR8Equinix——Operational17
Equinix FR4Equinix——Operational17

Source — Verified against operator sources · data pending on-site verification