Data Center Colocation Costs in Guinea: Q3 2026 Price Index

Compare 2 data centers in Guinea across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

2 facilities2 operators

Colocation pricing: Guinea & other markets — The Colocation Price Index →

Data centers

FacilityOperatorCountryCityCerts ⓘStatus
GUILAB Data CenterGUILABGuineaConakry——ISO 9001data pendingOperational
Data Center national de GuinéeÉtat guinéen / Ministère des Postes, Télécommunications et de l'Économie Numérique (MPTEN)GuineaConakry———data pendingOperational
All 2 facilities, A–Z

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

· · ·

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Guinea· · ·—2—
Côte d'Ivoire· · ·$0.2515—
Sierra Leone· · ·$0.3425—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Guinea's sole catalogued facility, GUILAB, is an independent carrier-neutral operator in Conakry's Kipé district (Ratoma commune), offering colocation, coworking and cloud services to telecom operators, ISPs, SMEs and public institutions alike — a broader customer mix than most single-facility African markets in this catalog target. The operator holds ISO 9001:2015 certification but does not publish power capacity, floor space or a formal Tier rating. Guinea's government separately opened a state data center in Conakry's Koloma district in September 2025 alongside the launch of the country's .gn domain, but it is not a third-party colocation facility and sits outside this catalog's scope. GlobalPetrolPrices shows no usable business electricity figure for Guinea as of December 2025, so no tariff is carried in this catalog's power index; grid supply in Conakry is thin enough that backup generation, not the metered rate, sets the real cost of running a facility.

Frequently asked questions

How much does colocation cost in Guinea?

No published wholesale $/kW benchmark exists for Guinea yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Where is colocation cheaper near Guinea?

Guinea sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Guinea market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Guinea?

Coloprice tracks 2 data centers in Guinea: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.