5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Côte d'Ivoire: Q3 2026 Price Index
Compare 5 data centers in Côte d'Ivoire across 4 operators, 3 MW: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Côte d'Ivoire & other markets — The Colocation Price Index → · Best data centers in Côte d'Ivoire → · Data center companies in Côte d'Ivoire · Colocation pricing and providers in Côte d'Ivoire →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Raxio CIV1 | Raxio Group | Côte d'Ivoire | Grand Bassam, near Abidjan | 3 | III | — | 53C | Operational |
| Datacenter Orange Grand-Bassam | Groupement Orange Services (GOS) | Côte d'Ivoire | Grand-Bassam, near Abidjan | — | III | — | data pending | Operational |
| Groupement Orange Services (GOS) Datacenter Orange Grand-Bassam | Groupement Orange Services (GOS) | Côte d'Ivoire | Grand-Bassam | — | III | — | data pending | Operational |
| Equinix AB1 IBX | Equinix | Côte d'Ivoire | Abidjan | — | — | — | 9· | Operational |
| Datacenter service Abidjan CIV01 | ST Digital | Côte d'Ivoire | Grand-Bassam | — | — | — | data pending | Operational |
Nothing matches the filters
All 5 facilities, A–Z
- Datacenter Orange Grand-Bassam Grand-Bassam, near Abidjan
- Datacenter service Abidjan CIV01 Grand-Bassam
- Equinix AB1 IBX Abidjan
- Groupement Orange Services (GOS) Datacenter Orange Grand-Bassam Grand-Bassam
- Raxio CIV1 Grand Bassam, near Abidjan
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.251
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 3 Tier III/IV · 0 AI-ready · 3+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Côte d'Ivoire | · · · | $0.251 | 5 | — |
| Ghana | · · · | $0.175 | 9 | — |
| Nigeria | · · · | $0.049 | 28 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Côte d'Ivoire's catalog spans three operators, all sited in the VITIB technology free zone in Grand-Bassam, a coastal town near Abidjan and a landing point for Atlantic subsea cables: Equinix AB1 (the operator's first West African site outside Nigeria and Ghana, brick-and-mortar plus containerized modules, three-day generator fuel reserve), Raxio Group's CIV1 (opened 2024, 400 racks, 3 MW, Uptime Institute Tier III Design and Constructed Facility awards), and Orange's Datacenter Grand-Bassam (the same pair of Tier III awards). None publishes total facility floor area for its VITIB building, and only Raxio and Orange carry a formal Uptime Institute Constructed Facility certification. Business electricity runs $0.251/kWh (GlobalPetrolPrices, Dec 2025, listed as Ivory Coast); state utility CIE draws on a mixed domestic gas and hydro generation base, with periodic dry-season hydro shortfalls affecting regional power balances.
Frequently asked questions
How much does colocation cost in Côte d'Ivoire?
No published wholesale $/kW benchmark exists for Côte d'Ivoire yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Côte d'Ivoire?
Commercial electricity in Côte d'Ivoire is $0.251 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Côte d'Ivoire?
On power alone, Ghana ($0.175/kWh), Nigeria ($0.049/kWh) run below Côte d'Ivoire. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Côte d'Ivoire market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Côte d'Ivoire?
Coloprice tracks 5 data centers in Côte d'Ivoire: 5 operational with 3 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day