1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Honduras: Q3 2026 Price Index

Compare 1 data centers in Honduras across 1 operators: capacity, status, certifications, facilities and colocation pricing context.

1 facilities1 operators

Colocation pricing: Honduras & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.186

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Honduras· · ·$0.1861
Guatemala· · ·$0.1986
El Salvador· · ·$0.2401

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Honduras enters the catalog through a single disclosed facility, Tigo Honduras' Data Center Evolution in the capital Tegucigalpa, reported as the first commercial data center in the country to receive Uptime Institute Tier III certification (Design Documents). The site is part of Millicom's wider Tigo Business colocation network, which also anchors the catalog entries for Guatemala, Paraguay and Bolivia; as with those sites, Tigo does not publish IT power capacity, floor area or rack count for the Tegucigalpa facility. Business electricity runs $0.186/kWh (GlobalPetrolPrices, Dec 2025), moderate by Central American standards, though state utility ENEE has a long history of financial distress and periodic supply shortfalls that add reliability risk beyond the metered tariff. Honduras' data-center market remains at an early, single-operator stage relative to neighboring Guatemala and Costa Rica, with no independent or hyperscale-linked operators yet disclosed.

Frequently asked questions

How much does colocation cost in Honduras?

No published wholesale $/kW benchmark exists for Honduras yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Honduras?

Commercial electricity in Honduras is $0.186 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Honduras?

Honduras sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Honduras market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Honduras?

Coloprice tracks 1 data centers in Honduras: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Tigo Data Center EvolutionTigo Honduras (Millicom)HondurasTegucigalpaIII23EOperational