8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Hungary: Q3 2026 Price Index
Compare 8 data centers in Hungary across 7 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Hungary & other markets — The Colocation Price Index → · Best data centers in Hungary → · Data center companies in Hungary · Colocation pricing and providers in Hungary →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Magyar Nemzeti Bank MNB Headquarters Data Center | Magyar Nemzeti Bank | Hungary | Budapest | — | III | — | data pending | Operational |
| VIVAnet DataCenter | VIVAnet | Hungary | Budapest | — | — | ISO 27001 | 23E | Operational |
| ATW HA Data Center | ATW.hu | Hungary | Budapest | — | — | — | data pending | Operational |
| ATW EXPO Data Center | ATW.hu | Hungary | Budapest | — | — | — | data pending | Operational |
| Magyar Telekom Dataplex (Asztalos Sándor) | Magyar Telekom | Hungary | Budapest | — | — | — | data pending | Operational |
| BIX Building (Victor Hugo street) | Budapesti Ingatlan Hasznosítási és Fejlesztési Nyrt. | Hungary | Budapest | — | — | — | data pending | Operational |
| Dataplex Budapest | T-Systems | Hungary | Budapest | — | — | — | data pending | Operational |
| ONE Solutions DC10-III | ONE Solutions (formerly Invitech) | Hungary | Budapest | — | — | — | data pending | Operational |
Nothing matches the filters
All 8 facilities, A–Z
- ATW EXPO Data Center Budapest
- ATW HA Data Center Budapest
- BIX Building (Victor Hugo street) Budapest
- Dataplex Budapest Budapest
- Magyar Nemzeti Bank MNB Headquarters Data Center Budapest
- Magyar Telekom Dataplex (Asztalos Sándor) Budapest
- ONE Solutions DC10-III Budapest
- VIVAnet DataCenter Budapest
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.364
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Hungary | · · · | $0.364 | 8 | — |
| Austria | · · · | $0.302 | 46 | — |
| Romania | · · · | $0.285 | 30 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Budapest's five disclosed facilities in the catalog come from five different Hungarian operators, reflecting a market still dominated by multi-tenant carrier-hotel buildings where ownership is hard to attribute to a single company from public sources alone. VIVAnet's 2024-built data center (ISO/IEC 27001, 140 racks) is the newest and best-documented site; Magyar Telekom's Asztalos Sándor úti facility and ONE Solutions' (formerly Invitech) DC10-III cluster are older, larger incumbent sites that publish little beyond their existence and, for Magyar Telekom, an address confirmed via the operator's own ISO certificates. ATW.hu's two small server rooms (HA and EXPO, opened 2009-2010) round out the list. No facility in Hungary currently discloses power capacity in MW or a verified Uptime Institute Tier certification. Business electricity runs $0.364/kWh (GlobalPetrolPrices, Dec 2025), the highest rate the catalog tracks in Central Europe. Coverage reflects the operators' own disclosure, not the full Budapest market — many buildings here are shared by multiple resellers with no single confirmed owner.
Frequently asked questions
How much does colocation cost in Hungary?
No published wholesale $/kW benchmark exists for Hungary yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Hungary?
Commercial electricity in Hungary is $0.364 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Hungary?
On power alone, Austria ($0.302/kWh), Romania ($0.285/kWh) run below Hungary. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Hungary market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Hungary?
Coloprice tracks 8 data centers in Hungary: 8 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
