Data Center Colocation Costs in Austria: Q3 2026 Price Index

Compare 4 data centers in Austria across 2 operators, 15 MW: capacity, status, certifications, facilities and colocation pricing context.

4 facilities15 MW tracked2 operators

Colocation pricing: Austria & other markets — The Colocation Price Index → · Best data centers in Austria →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.302

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 15+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Austria· · ·$0.3024
Germany· · ·$0.28390
Switzerland· · ·$0.29222

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Digital Realty (Interxion) is currently the only operator represented in Austria in the catalog, with three disclosed facilities in Vienna and zero published power capacity in MW — capacity sits behind a sales inquiry rather than a spec sheet, a pattern common across the operator’s European estate. VIE2, the largest by floor space at roughly 20,400 sqm, anchors a campus on Louis-Häfliger-Gasse alongside the smaller VIE1, with a separate VIE13 building on Siemensstrasse; all three connect directly to the VIX Internet Exchange, positioning Vienna as a Central and Eastern European connectivity hub rather than a purely domestic market. Commercial electricity runs $0.302/kWh (GlobalPetrolPrices, Dec 2025), close to German and Swiss levels despite a hydro-heavy Austrian grid — power cost is not the draw here, connectivity is. Coverage is a single operator’s public disclosure, not the full Vienna market — an early marker for a country the catalog has only just begun to track.

Frequently asked questions

How much does colocation cost in Austria?

No published wholesale $/kW benchmark exists for Austria yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Austria?

Commercial electricity in Austria is $0.302 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 4 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Austria?

On power alone, Germany ($0.283/kWh), Switzerland ($0.292/kWh) run below Austria. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Austria market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Austria?

Coloprice tracks 4 data centers in Austria: 4 operational with 15 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
VIE1Digital Realty (Interxion)AustriaVienna40DOperational
VIE2Digital Realty (Interxion)AustriaVienna40DOperational
VIE13Digital Realty (Interxion)AustriaVienna12·Operational
NTT Vienna 1 Data CenterNTT Global Data CentersAustriaVienna15.427EOperational