DCI Indonesia H2-02
OperationalDCI Indonesia H2-02 is a data center in Jakarta (Karawang), Indonesia, operated by DCI Indonesia, with 12 MW of published IT capacity, currently operational, opened in 2023.
The second building on DCI Indonesia's H2 Campus in Karawang, inaugurated June 2023 with Salim Group as Indonesia's first solar-powered data center.

- Operator
- DCI Indonesia
- City
- Jakarta (Karawang), Indonesia
- Power, MW
- 12 MW
- Cooling
- Air
- Opened
- 2023
Coloprice Score
26 out of 100
limited data · #19 of 54 in Indonesia
- Resilience0/35
- Compliance0/20
- Transparency6/20
- Scale10/15
- Maturity10/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
H2-02 is the second data center DCI Indonesia built on its H2 Campus east of Jakarta in Karawang, West Java, inaugurated on 22 June 2023 in partnership with Salim Group. The building added 12 MW of IT load to the campus, taking the combined H2-01/H2-02 total to 27 MW, on a site DCI says can scale to as much as 600 MW across 86 hectares. The campus's defining feature is a 30-hectare on-site solar installation with 30 MW of total electrical capacity, which DCI and Salim Group market as Indonesia's first solar-powered data center — a notable departure from the coal- and gas-heavy grid mix that otherwise dominates Indonesian data center power sourcing. The H2 Campus also includes an office building and serves more than 150 enterprise and cloud customers alongside DCI's older, larger H1 Campus in nearby Cibitung. DCI does not publish floor space or rack counts for the individual H2 buildings, and third-party coverage does not add construction-specific detail beyond the operator's own announcement. The site fills out DCI's strategy of building successive campuses along the Jakarta–Karawang–Cikarang corridor rather than a single flagship location.
- ▮Second building on H2 Campus, Karawang; inaugurated 22 June 2023
- ▮12 MW IT load; H2 campus combined total 27 MW (with H2-01)
- ▮Indonesia's first solar-powered data center — 30 MW on-site solar, 30-hectare array
- ▮Campus scalable to 600 MW across 86 hectares (DCI plan)
- ▮Built with Salim Group; over 150 enterprise/cloud customers campus-wide
Colocation pricing: Indonesia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Jakarta (Karawang)
Source — Verified against operator sources · data pending on-site verification