75 facilities · 48 operators · 2,501 MW tracked
Colocation in Jakarta: pricing, providers and capacity
48 operators run 75 tracked data centers in Jakarta (67 operational, 2,501+ MW published, 18 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
Greater Jakarta metro market: all facilities, capacity and operators →
How much does colocation cost in Jakarta?
48 operators run 75 tracked data centers in Jakarta; the largest by sites is DCI Indonesia (8). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Jakarta publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Jakarta
Operators with tracked data centers in Jakarta, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| DCI Indonesia | 8 / 8 | 96 | DCI Indonesia E1 | Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility, Uptime Institute Tier IV Gold Certification of Operational Sustainability | 2 |
| Princeton Digital Group | 5 / 3 | 360 | PDG JC2 Cibitung | TIA-942 Rated 3 (Design), ISO 27001, TIA-942 Rated 3 (Constructed Facility) | 2 |
| BDx Data Centers (Indosat Ooredoo Hutchison / Lintasarta joint venture) | 4 / 2 | 941 | BDx CGK1 | ISO/IEC 27001, PCI DSS, Uptime Tier III Design and Facility | 4 |
| Digital Edge | 3 / 2 | 529 | Digital Edge EDGE2 | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | 2 |
| NTT Global Data Centers | 3 / 3 | 21 | NTT Jakarta 2 (JKT2) | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Silver Certification of Operational Sustainability | 1 |
| NeutraDC (Telkom Indonesia) | 3 / 3 | not published | NeutraDC Hyperscale Data Center Cikarang | Uptime Tier III, Uptime Tier IV | — |
| PT. Datacomm Diangraha | 3 / 3 | not published | Datacomm Diangraha Grha Datacomm | ANSI/TIA-942-C Rated 3 (Constructed Facility) | — |
| PT Indonesia Super Corridor (CNI Group) | 2 / 2 | 5 | PT Indonesia Super Corridor (CNI Group) ISC Data Center Cyber-1 Building (CBR) Level 9 | Uptime Institute Tier III Certification of Constructed Facility Tier III Certification of Design Documents | — |
| Biznet (PT Supra Primatama Nusantara) | 2 / 2 | not published | Biznet Data Center Jakarta MidPlaza | not published | — |
| Digital Realty | 2 / 2 | not published | Digital Realty CGK10 | not published | — |
| neuCentrIX (Telkom Indonesia) | 2 / 2 | not published | neuCentrIX Meruya (Jakarta) | not published | — |
| PT Bank Rakyat Indonesia (Persero) Tbk | 2 / 2 | not published | PT Bank Rakyat Indonesia (Persero) Tbk BRI Data Center GTI, Levels 3 and 4 | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Gold Certification, Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| CoreWeave | 1 / 0 | 360 | CoreWeave Greater Jakarta AI Cloud Campus | not published | 1 |
| EDGNEX Data Centers (DAMAC) | 1 / 0 | 144 | EDGNEX Data Centers by DAMAC — Jakarta (Cikarang) | not published | 1 |
| ST Telemedia Global Data Centres | 1 / 1 | 24 | STT Jakarta 2 | ISO 27001, PCI DSS | 1 |
| BDx Data Centers | 1 / 1 | 15 | BDx Indonesia CGK3A | Tier III | 1 |
| Bersama Digital Data Centres | 1 / 1 | 5 | BDDC JST1 | Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility | — |
| Badan Pemeriksa Keuangan RI | 1 / 1 | not published | Badan Pemeriksa Keuangan RI PUSAT DATA BPK Rl | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| BDx DC Services | 1 / 1 | not published | BDx CGK3 - Jakarta TBS | not published | 1 |
| Bitera Data Center Indonesia Jakarta | 1 / 1 | not published | Bitera Data Center Indonesia Jakarta | not published | — |
| Cyber Data Center International (PT Media Akses Global Indo) | 1 / 1 | not published | Cyber Data Center International (Cyber 1) | Uptime Institute Tier III Certification of Design Documents | — |
| Digital Realty Bersama (BDDC) | 1 / 1 | not published | BDDC JBT1 (CGK10) | Uptime Institute Tier III Certification of Design Documents, ISO 27001, PCI DSS | — |
| DTP | 1 / 1 | not published | DTP C2 Data Center | not published | — |
| EdgeConneX | 1 / 1 | not published | EdgeConneX Jakarta Hyperscale Campus | ISO 27001, ISO 9001, PCI-DSS | — |
| Equinix | 1 / 1 | not published | Equinix JK1 | ISO 22301, ISO 27001, ISO 9001 | 1 |
| Kementerian Sekretariat Negara | 1 / 1 | not published | Kementerian Sekretariat Negara Data Center Sekretariat Negara, Jakarta | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| Lembaga Perlindungan Saksi dan Korban (LPSK) Republik Indonesia | 1 / 1 | not published | Lembaga Perlindungan Saksi dan Korban (LPSK) Republik Indonesia Datacenter LPSK Jakarta | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| NEX Datacenter (PT CBN Nusantara) | 1 / 1 | not published | NEX Datacenter — Cyber 2 Tower | Uptime Institute Tier III Certification of Design Documents | — |
| OMNI Data Center (PT Omni Data Center Indonesia) | 1 / 1 | not published | OMNI DC JKT1 | Uptime Institute Tier III Certification of Design Documents | — |
| PT Aplikanusa Lintasarta | 1 / 1 | not published | Lintasarta Technopark Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| PT Aristi Jasadata | 1 / 1 | not published | Aristi Data Center | Uptime Institute Tier III Certification of Design Documents | — |
| PT Astra Graphia Information Technology (AGIT) | 1 / 1 | not published | AGIT Menara FIF Data Center | ANSI/TIA-942-B Constructed Facility - Rated 2 | — |
| PT Bali Towerindo Sentra, Tbk | 1 / 1 | not published | Balitower / Balifiber Data Center | ANSI/TIA-942 Design - Rated 3 | — |
| PT Bank Negara Indonesia (Persero) Tbk | 1 / 1 | not published | PT Bank Negara Indonesia (Persero) Tbk BNI Data Center Slipi | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility Tier III Gold Certification | — |
| PT Dwi Tunggal Putra (DTP) | 1 / 1 | not published | GSD Alpha Data Centre | ANSI/TIA-942-B Design - Rated 3 | — |
| PT Indonesia Comnets Plus (PLN Icon Plus) | 1 / 1 | not published | PLN Icon Plus Data Center 2 (Gandul) | not published | — |
| PT Indosat Tbk. | 1 / 1 | not published | PT Indosat Tbk. DC Indosat Jakarta 2 | Uptime Institute Tier III Certification of Constructed Facility - Provisional | — |
| PT Inti Pusat Data Nusantara | 1 / 1 | not published | IPDN Data Center | ANSI/TIA-942-C Design - Rated 3 | — |
| PT Mitra Informatika Gemilang (MIG) | 1 / 1 | not published | MIG CGK11 Data Center | Uptime Institute Tier III Certification of Constructed Facility | — |
| PT Mora Telematika Indonesia (Moratel) | 1 / 1 | not published | Nusantara Data Center (NDC) | not published | — |
| PT Pegadaian | 1 / 1 | not published | PT Pegadaian The Gade Tower Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| PT Pertamina (Persero) | 1 / 1 | not published | PT Pertamina (Persero) Pertamina Sinergi Data Center (PSDC) | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| PT Solusi Data Cepat | 1 / 1 | not published | PRO DC 2 | ANSI/TIA-942-B Design - Rated 3 | — |
| PT. Artha Telekomindo (Arthatel) | 1 / 1 | not published | Arthatel SCBD Data Center | ANSI/TIA-942-B Rated 3 Constructed Facility | — |
| PT. Primacom Interbuana | 1 / 1 | not published | Primacom Data Center (Gedung Prima Sejahtera) | ANSI/TIA-942 Rated 3 Constructed Facility | — |
| SCBD Data Center | 1 / 1 | not published | SCBD Data Center | Rated 3 Design and Facilities certified (as stated by operator), ISO 27001, PCI-DSS | — |
| SM+ (PT SMPlus Sentra Data Persada / Sinar Mas) | 1 / 1 | not published | SM+ Data Center SME01B | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| SM+ Data Centers / LG Sinar Mas | 1 / 0 | not published | SM+ SMX01 Jakarta | not published | 1 |
Availability in Jakarta: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Jakarta?
By tracked sites: DCI Indonesia with 8. By published IT capacity: BDx Data Centers (Indosat Ooredoo Hutchison / Lintasarta joint venture) with 941 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Jakarta, including some that do not sell space.
Is there colocation capacity available in Jakarta right now?
Coloprice tracks 75 facilities here (67 operational, 8 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Jakarta?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Jakarta
One brief, several operators with capacity in Jakarta, Indonesia, same terms. Independent — no operator pays for position.
Colocation in Jakarta? One brief, several quotes.
Request quotes →