1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Isle of Man: Q3 2026 Price Index
Compare 1 data centers in Isle of Man across 1 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Isle of Man & other markets — The Colocation Price Index →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Continent 8 Isle of Man Data Center | Continent 8 Technologies | Isle of Man | Douglas | — | III* | — | data pending | Operational |
Nothing matches the filters
All 1 facilities, A–Z
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.391
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Isle of Man | · · · | $0.391 | 1 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| Ireland | · · · | $0.210 | 34 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
The Isle of Man's sole catalogued facility is Continent 8 Technologies' purpose-built data center in Douglas, at Middle River Industrial Estate, serving the island's large iGaming and financial-services licensing base rather than general enterprise demand. Continent 8 describes the site as Tier III, though this is the operator's own characterization rather than a Uptime Institute-certified rating. The island runs its own independent electricity grid — Manx Utilities, not an interconnector-fed extension of the UK or Irish grids — and publishes a Standard Commercial Tariff of 29.5 pence per kWh (plus a daily standing charge) as of its April 2026 update, among the higher small-market rates in this catalog once converted to dollars. As a Crown Dependency with its own gambling-licensing regime, the Isle of Man's data center demand is closely tied to keeping regulated iGaming infrastructure physically within the jurisdiction rather than to broader cloud or colocation growth.
Frequently asked questions
How much does colocation cost in Isle of Man?
No published wholesale $/kW benchmark exists for Isle of Man yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Isle of Man?
Commercial electricity in Isle of Man is $0.391 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Isle of Man?
On power alone, Ireland ($0.210/kWh) run below Isle of Man. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Isle of Man market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Isle of Man?
Coloprice tracks 1 data centers in Isle of Man: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
