34 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Ireland: Q3 2026 Price Index
Compare 34 data centers in Ireland across 13 operators, 192 MW: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Ireland & other markets — The Colocation Price Index → · Best data centers in Ireland → · Data center companies in Ireland · Colocation pricing and providers in Ireland →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Equinix DB1 | Equinix | Ireland | Dublin | — | — | CNDCPCyber Essentials+9 | 45D | Operational |
| Equinix DB2 | Equinix | Ireland | Dublin | — | — | CNDCPCyber Essentials+8 | 45D | Operational |
| Equinix DB3 | Equinix | Ireland | Dublin | — | — | ISO 9001ISO 14001+7 | 43D | Operational |
| DUB1 | Digital Realty | Ireland | Dublin | — | — | SOC 2SOC 3+6 | 43D | Operational |
| DUB2 | Digital Realty | Ireland | Dublin | — | — | PCI DSSISO 9001+6 | 43D | Operational |
| DUB3 | Digital Realty | Ireland | Dublin | — | — | SOC 2SOC 3+6 | 43D | Operational |
| DUB4 | Digital Realty | Ireland | Dublin | — | — | PCI DSSSOC 2+6 | 43D | Operational |
| Equinix DB4 | Equinix | Ireland | Dublin | — | — | ISO 9001ISO 22301+5 | 42D | Operational |
| Equinix DB5x | Equinix | Ireland | Dublin | — | — | CNDCPCyber Essentials+9 | data pending | Operational |
| DUB10 | Digital Realty | Ireland | Dublin | — | — | ISO 9001ISO 27001+6 | 36D | Operational |
| DUB12 | Digital Realty | Ireland | Dublin | — | — | SOC 1SOC 2+6 | 36D | Operational |
| DUB13 | Digital Realty | Ireland | Dublin | — | — | SOC 1SOC 2+7 | 36D | Operational |
| DUB14 | Digital Realty | Ireland | Dublin | — | — | SOC 1SOC 2+6 | 36D | Operational |
| Equinix DB6x | Equinix | Ireland | Dublin | — | — | ISO 22301ISO 27001+4 | data pending | Operational |
| Keppel DC Dublin 2 | Keppel DC REIT | Ireland | Dublin | — | — | LEEDISO 9001+3 | 31E | Operational |
| Keppel DC Dublin 1 | Keppel DC REIT | Ireland | Dublin | — | — | LEEDISO 9001+6 | 30E | Operational |
| CyrusOne DUB1 | CyrusOne | Ireland | Dublin | 54 | — | — | 30E | Operational |
| Pure Data Centres — Dublin Ballycoolin, Building 1 (DUB01) | Pure Data Centres Group | Ireland | Dublin | 14 | — | Zero Waste t… | data pending | Operational |
| Viatel VDC3 Profile Park | Viatel Technology Group | Ireland | Dublin | — | — | ISO 9001ISO 27001+2 | data pending | Operational |
| Vantage Dublin Campus (DUB1) | Vantage Data Centers | Ireland | Dublin | 52 | — | — | 23E | Under construction |
| EdgeConneX DUB01 | EdgeConneX | Ireland | Dublin | 18 | — | — | data pending | Operational |
| Servecentric Data Centre | Servecentric | Ireland | Dublin | — | III* | — | data pending | Operational |
| Pure Data Centres — Dublin Ballycoolin, Building 2 (DUB02) | Pure Data Centres Group | Ireland | Dublin | 24 | — | — | data pending | Under construction |
| Pure Data Centres — Dublin Ballycoolin, Building 3 (DUB03) | Pure Data Centres Group | Ireland | Dublin | 16 | — | — | data pending | Under construction |
| EdgeConneX DUB02 | EdgeConneX | Ireland | Dublin | 7 | — | — | data pending | Operational |
| Viatel VDC2 Park West | Viatel Technology Group | Ireland | Dublin | — | — | ISO 27001 | data pending | Operational |
| EdgeConneX DUB03 | EdgeConneX | Ireland | Dublin | 7 | — | — | data pending | Under construction |
| DUB11 | Digital Realty | Ireland | Dublin | — | — | — | 15E | Operational |
| Eircom Dublin (Citywest) | eircom | Ireland | Dublin | — | — | — | data pending | Operational |
| CIX | CORK INTERNET EXCHANGE | Ireland | Cork City | — | — | — | data pending | Operational |
| Hibernia Atlantic Dublin International Exchange Center | Hibernia Atlantic | Ireland | Dublin | — | — | — | data pending | Operational |
| Echelon DUB10 (Clondalkin) | Echelon Data Centres | Ireland | Dublin | — | — | — | 8· | Under construction |
| Echelon DUB30 (Kish) | Echelon Data Centres | Ireland | Arklow | — | — | — | 7· | Under construction |
| Echelon DUB20 (Arklow) | Echelon Data Centres | Ireland | Arklow | — | — | — | 5· | Under construction |
Nothing matches the filters
All 34 facilities, A–Z
- CIX Cork City
- CyrusOne DUB1 Dublin
- DUB1 Dublin
- DUB10 Dublin
- DUB11 Dublin
- DUB12 Dublin
- DUB13 Dublin
- DUB14 Dublin
- DUB2 Dublin
- DUB3 Dublin
- DUB4 Dublin
- Echelon DUB10 (Clondalkin) Dublin
- Echelon DUB20 (Arklow) Arklow
- Echelon DUB30 (Kish) Arklow
- EdgeConneX DUB01 Dublin
- EdgeConneX DUB02 Dublin
- EdgeConneX DUB03 Dublin
- Eircom Dublin (Citywest) Dublin
- Equinix DB1 Dublin
- Equinix DB2 Dublin
- Equinix DB3 Dublin
- Equinix DB4 Dublin
- Equinix DB5x Dublin
- Equinix DB6x Dublin
- Hibernia Atlantic Dublin International Exchange Center Dublin
- Keppel DC Dublin 1 Dublin
- Keppel DC Dublin 2 Dublin
- Pure Data Centres — Dublin Ballycoolin, Building 1 (DUB01) Dublin
- Pure Data Centres — Dublin Ballycoolin, Building 2 (DUB02) Dublin
- Pure Data Centres — Dublin Ballycoolin, Building 3 (DUB03) Dublin
- Servecentric Data Centre Dublin
- Vantage Dublin Campus (DUB1) Dublin
- Viatel VDC2 Park West Dublin
- Viatel VDC3 Profile Park Dublin
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.210
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 1 AI-ready · 192+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Ireland | · · · | $0.210 | 34 | — |
| United Kingdom | $213 | $0.454 | 199 | — |
| Netherlands | $180 | $0.179 | 133 | — |
| Germany | $250 | $0.269 | 274 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Ireland's price level is set administratively rather than by the cost of building. The grid-connection moratorium in the Dublin region means new capacity cannot simply be added where the demand is, so the scarce asset is an existing energised connection and the operators holding one price accordingly. Commercial power at $0.21/kWh is unremarkable, close to Japan's $0.201 and less than half the United Kingdom's $0.442, which tells you the premium here is not an energy premium. The catalog records 7 facilities and 52 MW, of which 3 are pipeline rather than operating, and none is flagged AI-ready or carries a Tier III or IV designation. Diversification outside the constrained region has begun, with Arklow the visible example. For a buyer, the question to put to every operator is not the delivery date but the status of the grid connection behind it.
Frequently asked questions
How much does colocation cost in Ireland?
No published wholesale $/kW benchmark exists for Ireland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 34 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Ireland?
Commercial electricity in Ireland is $0.210 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 34 facilities in our catalog, 7 of them announced or under construction.
Where is colocation cheaper near Ireland?
On power alone, Netherlands ($0.179/kWh) run below Ireland. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Ireland market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Ireland?
Coloprice tracks 34 data centers in Ireland: 27 operational with 93 MW of published IT power, 7 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.