1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Mandeville: 1 facilities, colocation pricing
How many data centers are in Mandeville?
Coloprice tracks 1 data centers in Mandeville, Jamaica: 1 operational, 0 under construction and 0 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.237
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Mandeville, Jamaica | · · · | $0.237 | 1 | — |
| Dominican Republic | · · · | $0.172 | 10 | — |
| Trinidad and Tobago | · · · | $0.053 | 5 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Mandeville?
Coloprice tracks 1 data centers in Mandeville, Jamaica: 1 operational, 0 under construction and 0 announced, run by 1 operators.
Which operators run data centers in Mandeville?
By number of facilities tracked: National Commercial Bank (Jamaica) (1).
How much does colocation cost in Mandeville, Jamaica?
No published wholesale $/kW benchmark exists for Mandeville, Jamaica yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Mandeville, Jamaica?
Commercial electricity in Mandeville, Jamaica is $0.237 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Mandeville, Jamaica?
On power alone, Dominican Republic ($0.172/kWh), Trinidad and Tobago ($0.053/kWh) run below Mandeville, Jamaica. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Mandeville, Jamaica market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| National Commercial Bank (Jamaica) NCB Distaster Recovery Site | National Commercial Bank (Jamaica) | — | II | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Jamaica
Colocation quotes in Mandeville: free, reply within one business day
Get Quotes →