▮▮Coloprice
← All countries

5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Trinidad and Tobago: Q3 2026 Price Index

Compare 5 data centers in Trinidad and Tobago across 5 operators: capacity, status, certifications, facilities and colocation pricing context.

5 facilities5 operators

Colocation pricing: Trinidad and Tobago & other markets — The Colocation Price Index → · Best data centers in Trinidad and Tobago → · Data center companies in Trinidad and Tobago · Colocation pricing and providers in Trinidad and Tobago →

Data centers

FacilityOperatorCountryCityCerts ⓘStatus
Barataria Trinidad Data CentreFujitsuTrinidad and TobagoBarataria—III—33EOperational
Telecommunications Services of Trinidad and Tobago Mausica Data CenterTelecommunications Services of Trinidad and TobagoTrinidad and TobagoD'Abadie—3—data pendingOperational
TSTT Mausica Data CentreTSTT (Telecommunications Services of Trinidad and Tobago)Trinidad and TobagoD'Abadie—3EPI DCOS Mat…SOC Type 2data pendingOperational
Informatics Data CenterInformatics LtdTrinidad and TobagoCharlieville———18EOperational
Air Link DC1Air Link Communications Ltd.Trinidad and TobagoPrinces Town———data pendingOperational
All 5 facilities, A–Z

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.053

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 3 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Trinidad and Tobago· · ·$0.0535—
Jamaica· · ·$0.2373—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Trinidad and Tobago's catalog now covers two purpose-built colocation sites. State operator TSTT's Mausica Data Centre in D'Abadie, commissioned 2010, states it is the only Caribbean facility holding both an EPI DCOS Maturity Level 3 rating and ANSI/TIA-942-B Rated 3 certification alongside a SOC Type 2 attestation. Informatics Ltd's Charlieville facility, commissioned June 2015 as a dedicated colocation building rather than an internal computer room, hosts Digicel Trinidad & Tobago's entire Phase 1 (46 racks) as anchor tenant, backed by a 300 kW generator and chilled-water cooling; the operator's own Tier 3-standard claim is not Uptime-certified. A third Uptime Institute-listed Tier III facility in the country belongs to a systems-integrator subsidiary and was not confirmed as an open commercial colocation offering, so it remains excluded here. Business electricity runs just $0.053/kWh (GlobalPetrolPrices, Dec 2025), among the lowest in the Western Hemisphere, underwritten by domestic natural gas production.

Frequently asked questions

How much does colocation cost in Trinidad and Tobago?

No published wholesale $/kW benchmark exists for Trinidad and Tobago yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Trinidad and Tobago?

Commercial electricity in Trinidad and Tobago is $0.053 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Trinidad and Tobago?

Trinidad and Tobago sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Trinidad and Tobago market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Trinidad and Tobago?

Coloprice tracks 5 data centers in Trinidad and Tobago: 5 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.