IIJ Matsue Data Center Park is a data center in Matsue, Shimane, Japan, operated by Internet Initiative Japan (IIJ), currently operational, opened in 2011.

Japan's first commercial containerized/modular data center, opened by IIJ in Matsue, Shimane Prefecture in April 2011 and expanded twice since, using outside-air cooling across a roughly 16,000 sqm site.

IIJ Matsue Data Center Park — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Internet Initiative Japan (IIJ)
City
Matsue, Shimane, Japan
Power, MW
—
Cooling
Air
Opened
2011
Floor space
16,000 m²
JDCC Facility Standard Tier 3 (partial Tier 4)ISO 27001ISO 14001
E

Coloprice Score

26 out of 100

Class E · #39 of 110 in Japan

  • Resilience0/35
  • Compliance10/20
  • Transparency7/20
  • Scale0/15
  • Maturity9/10
How the score is calculated →
Embed score badge
IIJ Matsue Data Center Park — Coloprice Score 26
<a href="https://coloprice.com/data-centers/japan/matsue/iij-matsue-data-center-park/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/iij-matsue-data-center-park.svg"
    alt="IIJ Matsue Data Center Park — Coloprice Score 26" height="64">
</a>

IIJ built the Matsue Data Center Park on a roughly 16,000 sqm site in Matsue City, Shimane Prefecture, as Japan's first commercially operated data center built from standardized shipping-container-style IT modules (branded 'IZmo'). Site 1 opened in April 2011 with around 100 racks; Site 2 followed in November 2013 on an adjacent plot with about 300 racks; a further System Module Building added roughly 300 more racks when it opened in June 2025. The original two sites share a combined maximum power-receiving capacity of 4,000 kVA, fed via dual-route high-voltage lines with N+1 UPS and on-site generators rated for at least 24 hours of continuous runtime. Cooling relies on outside (ambient) air rather than mechanical chillers, taking advantage of Shimane's climate to cut energy use. IIJ holds JDCC (Japan Data Center Council) facility-standard certification at Tier 3 for the site, with parts rated to Tier 4, alongside ISO 27001 (information security) and ISO 14001 (environmental management). IIJ has continued to expand the campus in phases, including plans for on-site solar generation at the newer module building.

  • ▮Japan's first commercial containerized/modular data center (opened April 2011)
  • ▮Expanded in three phases: Site 1 (2011), Site 2 (2013), System Module Building (2025)
  • ▮Combined 4,000 kVA power-receiving capacity across the original two sites
  • ▮Outside-air cooling; JDCC Facility Standard Tier 3 (partially Tier 4)
  • ▮ISO 27001 and ISO 14001 certified

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract