Equinix TY2
OperationalEquinix TY2 is a data center in Tokyo, Japan, operated by Equinix, currently operational.
Retail Equinix IBX data center in Higashi-Shinagawa, Shinagawa-ku, Tokyo, with free-cooling and aisle containment.

- Operator
- Equinix
- City
- Tokyo, Japan
- Power, MW
- —
- Cooling
- Air
- Floor space
- 3,018 m²
- Market benchmark
- $280 per kW per month wholesale · Tokyo (Inzai), Japan
- Index rate for the market, not this operator’s price list
- Address
- 3-8-21 Higashi-Shinagawa, Shinagawa-ku, Tokyo 140-0002, Japan · Open in maps ↗
1 sources · data pending on-site verification
Coloprice Score
40 out of 100
Class D · #12 of 133 in Japan
- Resilience10/35
- Compliance18/20
- Transparency5/20
- Scale0/15
- Maturity7/10
Connectivity: 117 networks and 6 internet exchanges are present in this facility.
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
TY2 is an Equinix IBX in Higashi-Shinagawa, Shinagawa-ku, Tokyo, and the operator describes it as an internet exchange point site with direct access to internet exchanges, stock exchange and financial services partners. The building is a seven-storey steel-framed reinforced-concrete structure with 3,018 m² (32,487 sq ft) of colocation space. Equinix publishes a minimum cabinet density of 4 kVA, 120/208 V distribution, N+1 UPS and generator redundancy, N+20% cooling redundancy and generator autonomy of 48 hours or more at full load. The floor load is 102 psf raised and 113 psf on slab, fire suppression is Inergen with aspirated detection, and the IBX sits below the 1000-year base flood elevation. Certifications listed include FISC, ISO 9001, ISO 14001, ISO 22301, ISO 27001, ISO 27017, ISO 50001, PCI DSS and SOC 1 and 2 Type II. Total power capacity is not published.
- ▮Seven-storey building with 3,018 m² (32,487 sq ft) of colocation space.
- ▮UPS and generator redundancy are N+1; cooling redundancy is N+20%.
- ▮Generator autonomy is 48 hours or more at full load.
- ▮Minimum cabinet density is 4 kVA at 120/208 V.
- ▮FISC is among the listed compliance programs.
Colocation pricing: Japan & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Tokyo: free, reply within one business day
Get Quotes →Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Compare with nearby facilities
| Facility | Operator | Power, MW | Tier | Status | km |
|---|---|---|---|---|---|
| Equinix TY2 | Equinix | — | — | Operational | 0 |
| Equinix TY8 | Equinix | — | — | Operational | <1 |
| Equinix TY6 | Equinix | — | — | Operational | <1 |
| Equinix TY7 | Equinix | — | — | Operational | <1 |
| Equinix TY15 | Equinix | — | — | Operational | 2 |
| Equinix TY1 | Equinix | — | — | Operational | 5 |
Source — Verified against operator sources · data pending on-site verification