▮▮Coloprice

78 facilities · 23 operators · 1,841 MW tracked

Colocation in Tokyo: pricing, providers and capacity

23 operators run 78 tracked data centers in Tokyo (66 operational, 1,841+ MW published, 7 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.

How much does colocation cost in Tokyo?

23 operators run 78 tracked data centers in Tokyo; the largest by sites is Equinix (14). Wholesale colocation in Tokyo is benchmarked at $280 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

$280 /kW·mo

Tokyo · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026

Published average; CBRE reports rents stable year over year

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Tokyo publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Tokyo

Operators with tracked data centers in Tokyo, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Equinix14 / 1454Equinix TY12xISO 9001, ISO 27001, ISO 22301—
Colt DCS6 / 5108Colt DCS Tokyo Inzai 4not published—
NTT Communications (NTT DOCOMO BUSINESS) — Nexcenter6 / 6not publishedNexcenter Tokyo 6 Data Centernot published—
MC Digital Realty5 / 5119MC Digital Realty NRT14not published2
Internet Initiative Japan (IIJ)5 / 520IIJ Shiroi Data Center CampusJDCC Facility Standard Tier 3, FISC, ISO 27001—
NTT DATA5 / 5not publishedNTT DATA Mitaka Data Center EASTnot published—
Ada Infrastructure4 / 1583Ada Infrastructure Tokyo West 1 (TKW1)Uptime Institute Tier III Certification of Design Documents (TKW1-1)1
AT TOKYO4 / 440AT TOKYO CC3 (Chuo Dai-3 Center)not published—
Telehouse4 / 318Telehouse Tokyo Tama 3JDCC Tier 4, ISO 270011
Digital Edge4 / 312Digital Edge TYO1ISO 14001, ISO 27001, ISO 45001—
NTT Global Data Centers3 / 1271NTT Tokyo 11 Data Centernot published—
IDC Frontier3 / 350IDC Frontier Tokyo Fuchu Data CenterISO 27001—
Sakura Internet3 / 3not publishedSakura Internet Higashi-Shinjuku Data Centernot published—
NEXTDC2 / 030NEXTDC TK1 Tokyonot published—
Keppel DC REIT2 / 2not publishedKeppel DC Tokyo 1not published—
AirTrunk1 / 1300AirTrunk TOK1 Tokyo Eastnot published1
Princeton Digital Group1 / 196PDG TY1 Saitama (Tokyo)not published1
DayOne1 / 042DayOne Kodaira Data Centernot published1
STACK Infrastructure1 / 136STACK TKY01not published—
ST Telemedia Global Data Centres1 / 132STT Tokyo 1TIA-942-C Design Certification, LEED Gold—
FLOW Digital Infrastructure1 / 030FLOW Digital TK7 & TK8 (Central Tokyo)not published—
CTC (ITOCHU Techno-Solutions)1 / 1not publishedCTC Mejirozaka Data Center (MDC)not published—
NEC1 / 1not publishedNEC Inzai Data Centernot published—

Availability in Tokyo: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Tokyo?

By tracked sites: Equinix with 14. By published IT capacity: Ada Infrastructure with 583 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Tokyo, including some that do not sell space.

Is there colocation capacity available in Tokyo right now?

Coloprice tracks 78 facilities here (66 operational, 12 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Tokyo?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Tokyo benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Tokyo

One brief, several operators with capacity in Tokyo, Japan, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.