Colocation in Tokyo (Inzai): pricing, providers and capacity

20 operators run 67 tracked data centers in Tokyo (Inzai) (59 operational, 1,561+ MW published, 7 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.

How much does colocation cost in Tokyo (Inzai)?

20 operators run 67 tracked data centers in Tokyo (Inzai); the largest by sites is Equinix (14). Wholesale colocation in Tokyo is benchmarked at $280 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

$280 /kW·mo

Tokyo · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026

Published average; CBRE reports rents stable year over year

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Tokyo (Inzai) publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Tokyo (Inzai)

Operators with tracked data centers in Tokyo (Inzai), sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Equinix14 / 1454Equinix TY12xISO 9001, ISO 27001, ISO 22301—
NTT Communications (NTT DOCOMO BUSINESS) — Nexcenter6 / 6not publishedNexcenter Tokyo 6 Data Centernot published—
MC Digital Realty5 / 5119MC Digital Realty NRT14not published2
Colt DCS5 / 488Colt Tokyo Inzai 2 Data Centrenot published—
Internet Initiative Japan (IIJ)5 / 520IIJ Shiroi Data Center CampusJDCC Facility Standard Tier 3, FISC, ISO 27001—
Ada Infrastructure4 / 1583Ada Infrastructure Tokyo West 1 (TKW1)Uptime Institute Tier III Certification of Design Documents (TKW1-1)1
AT TOKYO4 / 440AT TOKYO CC3 (Chuo Dai-3 Center)not published—
Telehouse (KDDI)4 / 318Telehouse Tokyo Tama 3JDCC Tier 4, ISO 270011
Digital Edge4 / 312Digital Edge TYO1ISO 14001, ISO 27001, ISO 45001—
IDC Frontier3 / 350IDC Frontier Tokyo Fuchu Data CenterISO 27001—
Sakura Internet3 / 3not publishedSakura Internet Higashi-Shinjuku Data Centernot published—
Keppel DC REIT2 / 2not publishedKeppel DC Tokyo 1not published—
AirTrunk1 / 1300AirTrunk TOK1 Tokyo Eastnot published1
Princeton Digital Group1 / 196PDG TY1 Saitama (Tokyo)not published1
DayOne1 / 042DayOne Kodaira Data Centernot published1
STACK Infrastructure1 / 136STACK TKY01not published—
ST Telemedia Global Data Centres1 / 132STT Tokyo 1TIA-942-C Design Certification, LEED Gold—
FLOW Digital Infrastructure1 / 030FLOW Digital TK7 & TK8 (Central Tokyo)not published—
NTT Global Data Centers1 / 121NTT Tokyo 11 Data Centernot published—
Colt Data Centre Services1 / 120Colt DCS Tokyo Inzai 4not published—

Availability in Tokyo (Inzai): what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Tokyo (Inzai)?

By tracked sites: Equinix with 14. By published IT capacity: Ada Infrastructure with 583 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Tokyo (Inzai), including some that do not sell space.

Is there colocation capacity available in Tokyo (Inzai) right now?

Coloprice tracks 67 facilities here (59 operational, 8 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Tokyo (Inzai)?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Tokyo benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Tokyo (Inzai)