Data Center Colocation Costs in Montenegro: Q3 2026 Price Index

Compare 1 data centers in Montenegro across 1 operators, 0 MW: capacity, status, certifications, facilities and colocation pricing context.

1 facilities0 MW tracked1 operators

Colocation pricing: Montenegro & other markets — The Colocation Price Index →

Data centers

FacilityOperatorCountryCityCerts ⓘStatus
BeeNet MNE-1BeeNet d.o.o.MontenegroPodgorica0.3——data pendingOperational
All 1 facilities, A–Z

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

· · ·

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Montenegro· · ·—1—
Serbia· · ·$0.15510—
Bosnia and Herzegovina· · ·$0.1354—
Albania· · ·$0.1544—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Montenegro enters the catalog through BeeNet's MNE-1 facility in Podgorica, part of the Belgrade-based operator's joint Serbia-Montenegro data center network, offering colocation and dedicated servers with 300 kW of total facility power and redundant uplinks; no certification or floor-space figure is published. No electricity-tariff benchmark is set for Montenegro: GlobalPetrolPrices' December 2025 snapshot returns no figure for either residential or business use, and while regulator REGAGEN periodically approves supplier tariffs for state utility EPCG, no single published industrial/commercial per-kWh figure comparable to the benchmarks used elsewhere in this catalog was found. Montenegro's grid runs on a mixed hydro-thermal base — hydropower from the Piva and Lim river systems plus the Pljevlja coal plant — with price exposure to the regional Hungarian Power Exchange (HUPEX) under the country's liberalized supply market. Podgorica's colocation demand remains at an early, single-operator stage rather than a competitive multi-vendor market.

Frequently asked questions

How much does colocation cost in Montenegro?

No published wholesale $/kW benchmark exists for Montenegro yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Where is colocation cheaper near Montenegro?

Montenegro sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Montenegro market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Montenegro?

Coloprice tracks 1 data centers in Montenegro: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.