Data Center Colocation Costs in Morocco: Q3 2026 Price Index

Compare 5 data centers in Morocco across 2 operators, 5 MW: capacity, status, certifications, facilities and colocation pricing context.

5 facilities5 MW tracked2 operators

Colocation pricing: Morocco & other markets — The Colocation Price Index → · Best data centers in Morocco →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.114

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 5 Tier III/IV · 0 AI-ready · 5+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Morocco· · ·$0.1145
Spain· · ·$0.13439

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Morocco's catalog centers on incumbent telecom inwi (Wana Corporate), which holds the full Design Documents and Constructed Facility Tier III certification from the Uptime Institute across four sites: Rabat-Technopolis DC1, Rabat Technopolis DC2 in nearby Salé, Settat and Marrakech. Atlas Cloud Services, an OCP Group/UM6P-linked joint venture, runs a 5 MW, 2,000 m² facility in Benguerir's Green City tech park; the operator markets it as "Tier III and Tier IV" certified, but the Uptime Institute's public registry currently lists only a Tier III Design Documents award, so the Tier IV claim is treated as unverified marketing rather than certification. Business electricity runs $0.114/kWh (GlobalPetrolPrices, Dec 2025), set by state utility ONEE across a mixed coal, gas, hydro, wind and solar grid.

Frequently asked questions

How much does colocation cost in Morocco?

No published wholesale $/kW benchmark exists for Morocco yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Morocco?

Commercial electricity in Morocco is $0.114 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Morocco?

Morocco sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Morocco market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Morocco?

Coloprice tracks 5 data centers in Morocco: 5 operational with 5 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Inwi Rabat-Technopolis DC1Wana Corporate SA (inwi)MoroccoRabatIII31EOperational
Inwi Rabat Technopolis DC2Wana Corporate SA (inwi)MoroccoSaléIII31EOperational
Inwi Settat DatacenterWana Corporate SA (inwi)MoroccoSettatIII31EOperational
Inwi Marrakech DatacenterWana Corporate SA (inwi)MoroccoMarrakechIII31EOperational
Atlas Cloud Services Benguerir Data CenterAtlas Cloud ServicesMoroccoBenguerir5III38DOperational