Data Center Colocation Costs in Mozambique: Q3 2026 Price Index

Compare 3 data centers in Mozambique across 3 operators, 3 MW: capacity, status, certifications, facilities and colocation pricing context.

3 facilities3 MW tracked3 operators

Colocation pricing: Mozambique & other markets — The Colocation Price Index → · Best data centers in Mozambique →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.080

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 3+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Mozambique· · ·$0.0803
South Africa· · ·$0.14426
Kenya· · ·$0.1719

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Mozambique's catalog spans two cities: Digital Realty's Maputo One (MPM1, formerly iColo, 350 sqm IT space, 80 racks on a 9,500 sqm campus) and Raxio Group's independently operated Raxio MZ1 in Maputo (2,000 m², 400 racks, 3 MW, Uptime Institute Tier III Design and Constructed Facility awards) — the country's first carrier-neutral Tier III facility by its developer's own description. A third site, Vodacom Mozambique's Business Matola Data Center in neighboring Matola, holds the same pair of Tier III awards. All three operators market their sites' proximity to Indian Ocean subsea-cable landings as an alternative Southern African connectivity point to routing traffic through South Africa. Business electricity runs $0.08/kWh (GlobalPetrolPrices, Dec 2025), among the lowest rates the catalog tracks, reflecting reliance on the Cahora Bassa hydro plant — though large export commitments to neighboring grids and periodic drought risk constrain how much of that capacity is reliably available domestically.

Frequently asked questions

How much does colocation cost in Mozambique?

No published wholesale $/kW benchmark exists for Mozambique yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Mozambique?

Commercial electricity in Mozambique is $0.080 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Mozambique?

Mozambique sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Mozambique market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Mozambique?

Coloprice tracks 3 data centers in Mozambique: 3 operational with 3 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Digital Realty MPM1 (Maputo)Digital Realty (formerly iColo)MozambiqueMaputo10·Operational
Raxio MZ1Raxio Data Centre LDAMozambiqueMaputo3III48DOperational
Vodacom Business Matola Data CenterVodacom MoçambiqueMozambiqueMatolaIII31EOperational