Data Center Colocation Costs in Nicaragua: Q3 2026 Price Index

Compare 3 data centers in Nicaragua across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

3 facilities2 operators

Colocation pricing: Nicaragua & other markets — The Colocation Price Index → · Best data centers in Nicaragua →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.212

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Nicaragua· · ·$0.2123
Costa Rica· · ·$0.2557
Honduras· · ·$0.1861

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Nicaragua enters the catalog through Uptime Institute's public registry, which lists three certified facilities, all enterprise sites rather than open commercial colocation. Banpro Grupo Promerica, the country's largest private bank, runs a Tier II Design-and-Constructed primary data center in the capital Managua and a geographically separated Tier III Design-and-Constructed secondary site in Boaco. Telefónica de Nicaragua's Edificio Técnico Granada in Managua carries a Tier II Design award. No independent commercial colocation operator with a published address or capacity figure was found for Nicaragua at this pass; regional operators Tigo/Millicom and Claro have each announced Nicaraguan data-center investment in press releases, but neither discloses a facility-level address that would meet this catalog's sourcing bar. Business electricity runs $0.212/kWh (GlobalPetrolPrices, Dec 2025), from a relatively diversified geothermal, hydro and wind mix with thermal backup — among the more renewable-heavy grids in Central America.

Frequently asked questions

How much does colocation cost in Nicaragua?

No published wholesale $/kW benchmark exists for Nicaragua yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Nicaragua?

Commercial electricity in Nicaragua is $0.212 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Nicaragua?

On power alone, Honduras ($0.186/kWh) run below Nicaragua. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Nicaragua market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Nicaragua?

Coloprice tracks 3 data centers in Nicaragua: 3 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Banpro Primary Data CenterBanpro Grupo PromericaNicaraguaManaguaII23EOperational
Banpro Secondary Data CenterBanpro Grupo PromericaNicaraguaBoacoIII31EOperational
Edificio Técnico Granada (ETG)Telefónica de NicaraguaNicaraguaManaguaII18EOperational