Data Center Colocation Costs in North Macedonia: Q3 2026 Price Index

Compare 2 data centers in North Macedonia across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

2 facilities2 operators

Colocation pricing: North Macedonia & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.304

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
North Macedonia· · ·$0.3042
Greece· · ·$0.22111
Bulgaria· · ·$0.3962
Serbia· · ·$0.1552

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

North Macedonia's catalog holds two Skopje facilities: neoDC, run by 30-year ICT company Neocom out of its own corporate building and self-described as the country's first and only carrier-neutral colocation data center, self-declared to a Tier 3+ design standard and ISO-certified across five standards; and Interspace Data Center, an ISO-certified colocation provider holding the country's top telecom-infrastructure design and construction licenses, with a disaster-recovery site roughly 100 km away. Neither claim is backed by an independent Uptime Institute award on record. Neither operator discloses IT power capacity or floor area. Business electricity runs $0.304/kWh (GlobalPetrolPrices, Dec 2025), the highest rate recorded in the Balkans in this index, reflecting significant power imports and reliance on aging domestic coal plants. Skopje's two disclosed operators give North Macedonia one of the more developed independent-colocation markets among this batch of new Balkan entries.

Frequently asked questions

How much does colocation cost in North Macedonia?

No published wholesale $/kW benchmark exists for North Macedonia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in North Macedonia?

Commercial electricity in North Macedonia is $0.304 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near North Macedonia?

On power alone, Greece ($0.221/kWh), Serbia ($0.155/kWh) run below North Macedonia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full North Macedonia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in North Macedonia?

Coloprice tracks 2 data centers in North Macedonia: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
neoDCNeocom A.D. SkopjeNorth MacedoniaSkopje30EOperational
Interspace Data CenterInterspaceNorth MacedoniaSkopje28EOperational