▮▮Coloprice
← All countries

1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Paraguay: Q3 2026 Price Index

Compare 1 data centers in Paraguay across 1 operators: capacity, status, certifications, facilities and colocation pricing context.

1 facilities1 operators

Colocation pricing: Paraguay & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.057

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Paraguay· · ·$0.0571
Brazil· · ·$0.12281
Argentina· · ·$0.0921

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Paraguay's catalog entry is Tigo Paraguay's Villa Elisa data center near Asunción, described by the operator as the country's first commercial colocation facility open to external clients. Built as a hybrid of prefabricated modular (Flexenclosure) and conventional construction, it opened in 2016 and was later expanded from 380 to 770 sqm; it carries Uptime Institute Tier III certification for both Design Documents and Constructed Facility. Tigo, part of Millicom, does not disclose IT power capacity for the site. Business electricity runs just $0.057/kWh (GlobalPetrolPrices, Dec 2025), among the cheapest rates in the Americas, underwritten by Paraguay's share of the binational Itaipú hydroelectric dam, one of the largest in the world and a source of significant surplus export power. That combination of ultra-cheap, renewable electricity and a still-thin disclosed colocation market makes Paraguay a market worth watching for future capacity announcements.

Frequently asked questions

How much does colocation cost in Paraguay?

No published wholesale $/kW benchmark exists for Paraguay yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Paraguay?

Commercial electricity in Paraguay is $0.057 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Paraguay?

Paraguay sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Paraguay market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Paraguay?

Coloprice tracks 1 data centers in Paraguay: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Tigo Asunción Data CenterTigo Paraguay (Millicom)ParaguayVilla ElisaIII41DOperational