MEO Covilhã Data Center Campus
OperationalMEO Covilhã Data Center Campus is a data center (Uptime Tier III, constructed facility certified) in Covilhã, Portugal, operated by MEO (Altice Portugal), formerly Portugal Telecom Data Center S.A., with 6.8 MW of published IT capacity, currently operational, opened in 2013.
One of the Iberian Peninsula's largest data center campuses, in Covilhã, operated by MEO/Altice Portugal and under agreement to be acquired by Asterion Industrial Partners for €120M.

- Operator
- MEO (Altice Portugal), formerly Portugal Telecom Data Center S.A.
- City
- Covilhã, Portugal
- Power, MW
- 6.8 MW
- Cooling
- Air
- Uptime Tier
- III · constructed facility certified
- Opened
- 2013
- Floor space
- 12,000 m²
- Renewable energy
- 100%
Coloprice Score
54 out of 100
Class C · #1 of 5 in Portugal
- Resilience24/35
- Compliance0/20
- Transparency12/20
- Scale9/15
- Maturity9/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Covilhã hosts one of the Iberian Peninsula's largest data center campuses, built by the entity long registered as Portugal Telecom Data Center S.A. and operated today under the MEO/Altice Portugal brand. The site was chosen partly for the region's cool climate and low natural-disaster risk, and opened in 2013 with an expansion following in 2018. The campus covers about 75,500 sqm, with roughly 12,000 sqm split across 24 IT and data halls, and currently runs 6.8 MW of installed IT power — a figure Altice's buyer, Asterion Industrial Partners, says can scale to 75 MW within the existing campus and as high as 175 MW on adjacent land where power has already been secured. MEO markets it as commercial colocation, with more than 50,000 servers hosted on-site, an air free-cooling design, a PUE around 1.25, and connectivity including two dedicated fiber links direct to Brazil. Uptime Institute has certified the facility to Tier III for both design and constructed facility. In December 2025 Asterion Industrial Partners agreed to acquire the campus from Altice Portugal for €120 million, a deal expected to close around Q1 2026 as the fund's entry into the Portuguese market.
- ▮~75,500 sqm campus, ~12,000 sqm across 24 IT/data halls
- ▮6.8 MW installed, expandable to 75–175 MW with secured power
- ▮Uptime Institute Tier III Design and Constructed Facility certification
- ▮Two dedicated fiber links direct to Brazil
- ▮Asterion Industrial Partners agreed to acquire the campus for €120M (announced Dec 2025)
Colocation pricing: Portugal & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification