▮▮Coloprice
← All countries

1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Portugal: Q3 2026 Price Index

Compare 1 data centers in Portugal across 1 operators: capacity, status, certifications, facilities and colocation pricing context.

1 facilities1 operators

Colocation pricing: Portugal & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.176

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Portugal· · ·$0.1761
Spain· · ·$0.13424

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Digital Realty is the only operator disclosed in Portugal, with a single facility: LIS1 in Carnaxide, just outside Lisbon, which the operator markets as "Europe's Atlantic gateway" for low-latency connectivity to the Americas and West Africa. The roughly 1,700 sqm, carrier-neutral site runs N+1 redundancy on both UPS and cooling; no compliance certifications, renewable-energy share, IT power capacity or year-opened date are published on the operator's page. Coverage here reflects one disclosed site in a market Digital Realty is still building out, not the full Lisbon colocation scene. Business electricity runs $0.176/kWh (GlobalPetrolPrices, Dec 2025), above neighbouring Spain's $0.134/kWh despite a similarly hydro- and wind-heavy grid — Portugal closed its last coal plant in 2021, and higher network costs on its smaller grid keep commercial rates elevated.

Frequently asked questions

How much does colocation cost in Portugal?

No published wholesale $/kW benchmark exists for Portugal yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Portugal?

Commercial electricity in Portugal is $0.176 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Portugal?

On power alone, Spain ($0.134/kWh) run below Portugal. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Portugal market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Portugal?

Coloprice tracks 1 data centers in Portugal: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
LIS1Digital Realty (Interxion)PortugalCarnaxide12·Operational