Desert Dragon Al-Kharj Hyperscaler Data Center #1 (KHS-1)
Under constructionDesert Dragon Al-Kharj Hyperscaler Data Center #1 (KHS-1) is a data center (Uptime Tier III, design certified) in Al-Kharj, Saudi Arabia, operated by Desert Dragon Data Centers, with 59 MW of published IT capacity, currently under construction.
Desert Dragon Data Centers' first Al-Kharj facility (KHS-1) is the initial phase of a planned 187 MW, five-site hyperscale cluster across Saudi Arabia, developed with China Mobile International and LMT Group via contractor ICS Arabia; the Al-Kharj phase targets 59 MW and holds only an Uptime Institute Tier III Design certification so far, with construction phased through 2029.

- Operator
- Desert Dragon Data Centers
- City
- Al-Kharj, Saudi Arabia
- Power, MW
- 59 MW
- Cooling
- Liquid
- Uptime Tier
- III · design certified
- AI-ready
- Yes
Coloprice Score
38 out of 100
Class D · #3 of 20 in Saudi Arabia
- Resilience16/35
- Compliance0/20
- Transparency4/20
- Scale15/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Desert Dragon Data Centers broke ground on its Al-Kharj hyperscale campus in November 2024, the first of five planned sites — alongside downtown Riyadh, Jeddah, Dammam and NEOM — that the company says will total 187 MW and more than 7,000 high-density racks once complete. The project is a joint undertaking with China Mobile International and LMT Group, with ICS Arabia as main contractor, on a 25-year MODON industrial-land lease covering roughly 41,500 sq m at the Al-Kharj site. Desert Dragon markets the campus for sovereign colocation, enterprise colocation and hyperscale wholesale customers, offering direct-to-chip and immersion liquid cooling alongside conventional air cooling for AI and high-performance-computing workloads. The Al-Kharj phase is designed for roughly 59 MW of N+1 power, backed by eight 2.5 MW generator strings, while a smaller 6 MW facility is planned for downtown Riyadh. Uptime Institute has so far awarded only a Tier III Certification of Design Documents for KHS-1; no Constructed Facility certification has been issued, and the company's phased rollout is expected to run from 2026 to 2029.
- ▮First of a planned 187 MW, five-site cluster (Al-Kharj, Riyadh, Jeddah, Dammam, NEOM)
- ▮Joint project with China Mobile International and LMT Group; ICS Arabia as main contractor
- ▮~59 MW N+1 target at Al-Kharj; direct-to-chip and immersion cooling for AI workloads
- ▮25-year MODON land lease, roughly 41,500 sq m at Al-Kharj
- ▮Uptime Institute Tier III Design certification only — construction phased through 2029
Colocation pricing: Saudi Arabia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification