1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in NEOM: 1 facilities, colocation pricing
How many data centers are in NEOM?
Coloprice tracks 1 data centers in NEOM, Saudi Arabia: 0 operational, 0 under construction and 1 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.074
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 360+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| NEOM (Oxagon), Saudi Arabia | · · · | $0.074 | 1 | — |
| United Arab Emirates | · · · | $0.110 | 57 | — |
| Qatar | · · · | $0.036 | 12 | — |
| India | · · · | $0.109 | 312 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in NEOM?
Coloprice tracks 1 data centers in NEOM, Saudi Arabia: 0 operational, 0 under construction and 1 announced, run by 1 operators.
Which operators run data centers in NEOM?
By number of facilities tracked: DataVolt (1).
What is the total data center power capacity in NEOM?
Facilities that publish capacity add up to 360 MW (1 of 1 sites disclose a figure); the largest published site is DataVolt Oxagon AI Campus (NEOM) with 360 MW.
How much does colocation cost in NEOM (Oxagon), Saudi Arabia?
No published wholesale $/kW benchmark exists for NEOM (Oxagon), Saudi Arabia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in NEOM (Oxagon), Saudi Arabia?
Commercial electricity in NEOM (Oxagon), Saudi Arabia is $0.074 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near NEOM (Oxagon), Saudi Arabia?
On power alone, Qatar ($0.036/kWh) run below NEOM (Oxagon), Saudi Arabia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full NEOM (Oxagon), Saudi Arabia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| DataVolt Oxagon AI Campus (NEOM) | DataVolt | 360 | — | Announced |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in NEOM: free, reply within one business day
Get Quotes →