▮▮Coloprice

Equinix SG6

Announced

Equinix SG6 is a data center in Singapore, Singapore, operated by Equinix, with 20 MW of published IT capacity, announced, not yet built.

Equinix's sixth Singapore IBX, announced in November 2024 as a liquid-cooled, AI-focused facility with up to 20 MW of capacity, targeted to open in Q1 2027.

Equinix SG6 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · planned
Operator
Equinix
City
Singapore, Singapore
Power, MW
20 MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

19 out of 100

limited data · #24 of 33 in Singapore

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale15/15
  • Maturity0/10
How the score is calculated →
Embed score badge
Equinix SG6 — Coloprice Score 19
<a href="https://coloprice.com/data-centers/singapore/singapore/equinix-sg6/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/equinix-sg6.svg"
    alt="Equinix SG6 — Coloprice Score 19" height="64">
</a>

Announced in November 2024, SG6 is Equinix's sixth Singapore IBX and the first in the country designed from the ground up for AI and high-performance computing rather than general colocation. The nine-storey building is being developed with an initial investment above US$260 million and will scale to more than 20 MW of critical power at full build, with liquid cooling engineered in to support the dense racks that AI training and inference workloads require. The project was allocated under Singapore's Data Centre Call for Application (DC-CFA) pilot, the government's mechanism for granting new data-center capacity in a power-constrained market, and Equinix has said the site will run on renewable energy once operational. SG6 is targeted to open in the first quarter of 2027 alongside the operator's existing five-site Singapore campus (SG1–SG5). No address, floor area or certification has been published yet.

  • Announced November 2024, targeted to open Q1 2027
  • Up to 20 MW of critical power at full build
  • Liquid cooling engineered in for AI and HPC density
  • Initial investment above US$260 million
  • Allocated under Singapore's Data Centre Call for Application (DC-CFA) pilot

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Singapore

Source — Verified against operator sources · data pending on-site verification