Data centers in Samrand, Centurion: 3 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.144
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 12+ MW · sources
Frequently asked questions
How much does colocation cost in Samrand, Centurion, South Africa?
No published wholesale $/kW benchmark exists for Samrand, Centurion, South Africa yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Samrand, Centurion, South Africa?
Commercial electricity in Samrand, Centurion, South Africa is $0.144 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Samrand, Centurion, South Africa market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Africa Data Centres JHB2 (Samrand) | Africa Data Centres (Liquid Intelligent Technologies) | — | IV | Operational |
| NTT Johannesburg 1 | NTT Global Data Centers | 12 | — | Operational |
| Digital Parks Africa Samrand | Digital Parks Africa (Master Power Technologies) | — | — | Operational |