4 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Isando, Johannesburg: 4 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.144
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
Frequently asked questions
How much does colocation cost in Isando, Johannesburg, South Africa?
No published wholesale $/kW benchmark exists for Isando, Johannesburg, South Africa yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Isando, Johannesburg, South Africa?
Commercial electricity in Isando, Johannesburg, South Africa is $0.144 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 4 facilities in our catalog, 0 of them announced or under construction.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Isando, Johannesburg, South Africa market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Teraco JB1 (Isando) | Teraco (Digital Realty) | — | — | Operational |
| Teraco JB3 (Isando) | Teraco (Digital Realty) | — | — | Operational |
| Teraco JB5 (Isando) | Teraco (Digital Realty) | — | — | Operational |
| Equinix JN1 IBX | Equinix | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.