Kakao Data Center Ansan
OperationalKakao Data Center Ansan is a data center in Ansan, South Korea, operated by Kakao, with 40 MW of published IT capacity, currently operational, opened in 2024.
Kakao's first wholly self-built and self-operated data center, opened January 2024 on Hanyang University's ERICA campus in Ansan — built after the October 2022 SK C&C Pangyo fire outage.

- Operator
- Kakao
- City
- Ansan, South Korea
- Power, MW
- 40 MW
- Cooling
- Air
- Opened
- 2024
- Floor space
- 47,378 m²
- Racks
- 4,000
Coloprice Score
33 out of 100
Class E · #8 of 38 in South Korea
- Resilience0/35
- Compliance0/20
- Transparency12/20
- Scale11/15
- Maturity10/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Kakao Data Center Ansan is Kakao's first wholly self-built and self-operated data center, completed in September 2023 and brought into service in January 2024 on the ERICA campus of Hanyang University in Ansan, Gyeonggi-do, about 40 km southwest of Seoul. Kakao built the facility in direct response to an October 2022 fire at a third-party data center — SK C&C's Pangyo site — that knocked out KakaoTalk and other services for days, and the design emphasizes redundancy: backup power equal to 100% of primary supply, two independent substations, and standby generators sized to keep the site running if both substations fail. The building covers 47,378 square meters with roughly 4,000 racks and capacity for about 120,000 servers and 6 exabytes of storage. A free-cooling system run in three seasonal modes cuts water use by about 98% versus conventional designs and keeps PUE at or below 1.3. The structure is rated to withstand a magnitude-6.5 earthquake and holds top domestic grades for building energy efficiency and green building certification.
- ▮Kakao's first self-built, self-operated data center
- ▮Built after the Oct 2022 SK C&C Pangyo fire outage
- ▮47,378 sqm, ~4,000 racks, ~120,000 servers
- ▮100% redundant backup power, two substations
- ▮PUE ≤1.3; free cooling cuts water use ~98%
Colocation pricing: South Korea & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification