Quetta QTT-MAD1

Under construction

Quetta QTT-MAD1 is a data center (Uptime Tier III, design certified) in Tres Cantos, Spain, operated by Quetta Data Centers, with 20 MW of published IT capacity, currently under construction.

Quetta Data Centers, an Azora and Core Tech Capital platform, is building an AI-oriented Edge data center in Tres Cantos, near Madrid.

Quetta QTT-MAD1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Quetta Data Centers
City
Tres Cantos, Spain
Power, MW
20 MW
Cooling
Liquid
Uptime Tier
III · design certified
Floor space
11,880 m²
AI-ready
Yes
Tier III Certification of Design Documents (Uptime Institute)
D

Coloprice Score

41 out of 100

Class D · #14 of 50 in Spain

  • Resilience16/35
  • Compliance0/20
  • Transparency7/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Quetta QTT-MAD1 — Coloprice Score 41
<a href="https://coloprice.com/data-centers/spain/tres-cantos/quetta-qtt-mad1-tres-cantos/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/quetta-qtt-mad1-tres-cantos.svg"
    alt="Quetta QTT-MAD1 — Coloprice Score 41" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Quetta QTT-MAD1 — Top 25 data centers in Spain 2026
#14 of 50 · See the list →

QTT-MAD1 is the first data center of Quetta Data Centers, a platform created by real-estate investor Azora with Core Tech Capital to build Edge, AI-oriented facilities across Spain and Portugal. The Tres Cantos site, north of Madrid, started construction with capacity doubled to 20 MW across roughly 11,880 sqm of building space, including about 3,200 sqm of IT data halls delivering 6.45 MW of IT load at 5 kW per rack. Quetta designed the facility around closed-loop direct liquid cooling, targeting zero net water consumption (WUE of 0) and a PUE below 1.15, running on 100% renewable electricity. The Uptime Institute lists the site as a Tier III Certification of Design Documents. Tres Cantos is the first of six planned Quetta Edge data centers across the Iberian peninsula, part of a program the company says will exceed €450 million in total investment, with a second project already underway in Barcelona.

  • Capacity doubled to 20 MW during construction
  • ~11,880 sqm total, ~3,200 sqm IT data halls
  • Closed-loop direct liquid cooling, WUE of 0, PUE < 1.15
  • 100% renewable electricity
  • First of six planned Quetta Edge sites in Spain and Portugal

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release: