NorthC Münchenstein (Basel) 3
Under constructionNorthC Münchenstein (Basel) 3 is a data center in Arlesheim (Basel area), Switzerland, operated by NorthC, with 7.5 MW of published IT capacity, currently under construction.
NorthC's largest planned Swiss facility, under construction on the uptownBasel innovation campus in Arlesheim despite its Münchenstein branding, targeting 2027 with 7.5 MW of AI-ready capacity.

- Operator
- NorthC
- City
- Arlesheim (Basel area), Switzerland
- Power, MW
- 7.5 MW
- Cooling
- Liquid
- AI-ready
- Yes
- Address
- Schorenweg 21, 4144 Arlesheim, Switzerland · Open in maps ↗
1 sources · data pending on-site verification
Coloprice Score
22 out of 100
limited data · #25 of 66 in Switzerland
- Resilience0/35
- Compliance0/20
- Transparency6/20
- Scale13/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Branded Münchenstein (Basel) 3 despite sitting a short distance away in Arlesheim, this is NorthC's third and largest planned Swiss facility, under construction on the uptownBasel innovation campus with a targeted 7.5 MW of IT capacity — more than any of the operator's other Swiss sites once live. NorthC is targeting availability from 2027 and, like its Geneva project, is designing the building for high-density AI, medtech and industrial workloads with a target PUE of 1.2 or better. The operator plans direct peering with SwissIX and, as with its existing Swiss facilities in Münchenstein, Biel and Winterthur, intends to run the site on hydropower with waste heat recovered for campus heating. No certifications have been disclosed yet given the facility's pre-operational status. Together with the existing Münchenstein 1 and 2 buildings a short distance away, this gives NorthC three linked sites in the greater Basel area once construction completes, alongside its own operating Biel and Winterthur facilities and the separate Geneva project under development.
- ▮7.5 MW planned IT capacity — largest of NorthC's Swiss sites once live
- ▮Under construction on the uptownBasel innovation campus; targeting 2027
- ▮Designed for high-density AI, medtech and industrial workloads, design PUE ≤1.2
- ▮Planned direct SwissIX peering
- ▮Planned hydropower supply with waste heat recovered for campus heating
Colocation pricing: Switzerland & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Arlesheim (Basel area): free, reply within one business day
Get Quotes →Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification