▮▮Coloprice
← All countries

22 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Switzerland: Q3 2026 Price Index

Compare 22 data centers in Switzerland across 6 operators, 226 MW: capacity, status, certifications, facilities and colocation pricing context.

22 facilities226 MW tracked6 operators

Colocation pricing: Switzerland & other markets — The Colocation Price Index → · Best data centers in Switzerland →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.292

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 2 AI-ready · 226+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Switzerland· · ·$0.29222
France· · ·$0.18553
Italy· · ·$0.32324
Germany· · ·$0.28390

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Equinix is the only operator represented in Switzerland in the catalog, with five disclosed IBX facilities split between Zurich (ZH2, ZH4, ZH5) and Geneva (GV1, GV2 in the Le Lignon district) — none flagged AI-ready, none carrying an Uptime or TIA-942 certification, and none with a published site power figure in MW, consistent with the operator's pattern across its European estate of holding capacity data behind a sales inquiry. ZH5, in neighboring Oberengstringen, is the largest by floor space at roughly 79,416 sq ft. Business electricity runs $0.292/kWh (GlobalPetrolPrices, Dec 2025) — among the highest commercial rates the catalog tracks — despite a grid that is roughly 90% hydro and nuclear, reflecting Switzerland's high transmission and distribution costs rather than generation scarcity. Coverage here is a single operator's public disclosure, not the full Zurich/Geneva market — an early marker for a country the catalog has only just begun to track.

Frequently asked questions

How much does colocation cost in Switzerland?

No published wholesale $/kW benchmark exists for Switzerland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 22 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Switzerland?

Commercial electricity in Switzerland is $0.292 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 22 facilities in our catalog, 2 of them announced or under construction.

Where is colocation cheaper near Switzerland?

On power alone, France ($0.185/kWh), Germany ($0.283/kWh) run below Switzerland. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Switzerland market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Switzerland?

Coloprice tracks 22 data centers in Switzerland: 20 operational with 214 MW of published IT power, 2 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Equinix ZH2EquinixSwitzerlandZurich45DOperational
Equinix ZH4EquinixSwitzerlandZurich45DOperational
Equinix ZH5EquinixSwitzerlandOberengstringen45DOperational
Equinix GV1EquinixSwitzerlandGeneva45DOperational
Equinix GV2EquinixSwitzerlandLe Lignon45DOperational
ZUR1Digital Realty (Interxion)SwitzerlandGlattbrugg38DOperational
ZUR2Digital Realty (Interxion)SwitzerlandGlattbrugg38DOperational
ZUR3Digital Realty (Interxion)SwitzerlandGlattbrugg16EOperational
NTT Zurich 1 Data CenterNTT Global Data CentersSwitzerlandRümlang2027EOperational
Vantage Zurich I Campus (Winterthur)Vantage Data CentersSwitzerlandZurich (Winterthur)4024·Operational
Vantage Zurich II Campus (Glattfelden)Vantage Data CentersSwitzerlandZurich (Glattfelden)2424·Operational
STACK GEN02STACK InfrastructureSwitzerlandGeneva3022·Operational
STACK GEN03STACK InfrastructureSwitzerlandGeneva1221·Operational
STACK ZUR01STACK InfrastructureSwitzerlandZurich1021·Operational
STACK ZUR02STACK InfrastructureSwitzerlandZurich3622·Operational
STACK ZUR03STACK InfrastructureSwitzerlandZurich3022·Operational
NorthC Biel (Bern)NorthCSwitzerlandBiel/Bienne (Bern area)439DOperational
NorthC GenevaNorthCSwitzerlandMeyrin (Geneva area)4.521·Under construction
NorthC Münchenstein (Basel) 1NorthCSwitzerlandMünchenstein (Basel area)634EOperational
NorthC Münchenstein (Basel) 2NorthCSwitzerlandMünchenstein (Basel area)0.629EOperational
NorthC Münchenstein (Basel) 3NorthCSwitzerlandArlesheim (Basel area)7.522·Under construction
NorthC Winterthur (Zurich)NorthCSwitzerlandZurich (Winterthur)1.831EOperational