▮▮Coloprice

NorthC Geneva

Under construction

Rte du Nant-d'Avril 152, 1217 Meyrin, Switzerland

NorthC Geneva is a data center in Meyrin (Geneva area), Switzerland, operated by NorthC, with 4.5 MW of published IT capacity, currently under construction.

NorthC's AI-oriented Swiss data center under construction at "The Hive" tech park in Meyrin next to CERN, targeting 2028 availability with direct-to-chip liquid cooling.

Operator
NorthC
City
Meyrin (Geneva area), Switzerland
Power, MW
4.5 MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

21 out of 100

limited data · #21 of 22 in Switzerland

  • Resilience0/35
  • Compliance0/20
  • Transparency6/20
  • Scale12/15
  • Maturity3/10
How the score is calculated →
Embed score badge
NorthC Geneva — Coloprice Score 21
<a href="https://coloprice.com/data-centers/switzerland/meyrin/northc-geneva/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/northc-geneva.svg"
    alt="NorthC Geneva — Coloprice Score 21" height="64">
</a>

Geneva is NorthC's newest announced Swiss site, under construction at "The Hive" technology park in Meyrin, next to CERN on the western edge of Geneva, with the operator targeting availability from 2028. Unlike NorthC's existing hydropower-run Swiss buildings in Biel, Münchenstein and Winterthur, Geneva is being designed from the outset for high-density AI workloads, with direct-to-chip liquid cooling and a design-target PUE of 1.2 or better, plus GPU-ready rack provisioning. Planned IT capacity is 4.5 MW. NorthC intends to connect the site directly to CIXP, the CERN Internet Exchange Point, and to link it into the rest of its Swiss footprint over a planned 400 Gbps backbone. As with its operating Swiss sites, the operator plans to run the facility on hydropower with waste-heat reuse. No certifications have been published yet for a site still in construction. Once live, Geneva would become NorthC's fourth active Swiss metro alongside Basel, Biel and Winterthur/Zurich.

  • Under construction at "The Hive" tech park in Meyrin, next to CERN; targeting 2028
  • 4.5 MW planned IT capacity with direct-to-chip liquid cooling, design PUE ≤1.2
  • Planned direct peering with CIXP, the CERN Internet Exchange Point
  • GPU-ready racks, positioned for high-density AI workloads
  • Planned hydropower supply with waste-heat reuse, as at NorthC's other Swiss sites

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification