▮▮Coloprice

GEDC Rayong

Announced

GEDC Rayong is a data center in Rayong, Thailand, operated by Gulf Edge, with 100 MW of published IT capacity, announced, not yet built.

100 MW hyperscale campus in Rayong (EEC), announced for 2027.

GEDC Rayong — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · planned
Operator
Gulf Edge
City
Rayong, Thailand
Power, MW
100 MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

19 out of 100

limited data · #27 of 44 in Thailand

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale15/15
  • Maturity0/10
How the score is calculated →
Embed score badge
GEDC Rayong — Coloprice Score 19
<a href="https://coloprice.com/data-centers/thailand/rayong/gedc-rayong/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/gedc-rayong.svg"
    alt="GEDC Rayong — Coloprice Score 19" height="64">
</a>

GEDC01 in Rayong is Gulf Edge's step from joint-venture participant to hyperscale campus developer in its own right. Sited in the Eastern Economic Corridor, the project is planned for a maximum service capacity of 100 MW — among the largest single campuses announced in Thailand — with commercial operations scheduled for the fourth quarter of 2027 and Gulf indirectly holding a 70% stake. The EEC location leverages the parent group's home turf: Gulf operates substantial power generation in the corridor, giving the campus a direct line to large, reliable energy supply, which is the binding constraint for AI-scale facilities. The development is framed as AI-ready with liquid cooling in the design, though as an announced project it has no published certifications, floor areas or density specifications yet. If delivered on schedule, GEDC01 would materially expand Thailand's hyperscale capacity outside the Bangkok metro and give cloud and AI tenants an EEC alternative anchored by an energy incumbent.

  • 100 MW maximum service capacity planned in Rayong, EEC
  • Commercial operations scheduled for Q4 2027
  • Gulf indirectly holds a 70% stake in the project
  • AI-ready design with liquid cooling planned
  • Backed by Gulf's power generation footprint in the Eastern Economic Corridor

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Rayong

Source — Verified against operator sources · data pending on-site verification