2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Togo: Q3 2026 Price Index
Compare 2 data centers in Togo across 2 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Togo & other markets — The Colocation Price Index →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| SIN-1-LOME Data Centre | Société d'Infrastructures Numériques | Togo | Lomé | — | III | — | data pending | Operational |
| Cloud & Racks Datacenter (LFW-01) | CAFÉ Informatique & Télécommunications | Togo | Lomé | — | — | — | data pending | Operational |
Nothing matches the filters
All 2 facilities, A–Z
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.191
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Togo enters the catalog through SIN-1-LOME Data Centre in Lomé, operated by Société d'Infrastructures Numériques and holding an Uptime Institute Tier III Certification of Design Documents; no further technical specifications are published, so the entry rests on the Uptime Institute registry alone. GlobalPetrolPrices (Dec 2025) puts Togo's business electricity rate at $0.191/kWh; state utility CEET blends domestic hydro generation at the Nangbeto dam with thermal plants and imports over the West African Power Pool from Ghana, Nigeria and Cote d'Ivoire, leaving Lomé exposed to regional supply swings.
Frequently asked questions
How much does colocation cost in Togo?
No published wholesale $/kW benchmark exists for Togo yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Togo?
Commercial electricity in Togo is $0.191 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Togo?
On power alone, Ghana ($0.175/kWh), Nigeria ($0.049/kWh) run below Togo. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Togo market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Togo?
Coloprice tracks 2 data centers in Togo: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day