▮▮Coloprice

5 facilities · 5 operators

Colocation in Trinidad and Tobago: pricing, providers and markets

5 operators run 5 tracked data centers in Trinidad and Tobago across 0 cities with at least three sites (5 operational, 0+ MW published, 0 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Trinidad and Tobago?

5 operators run 5 tracked data centers in Trinidad and Tobago; the largest by sites is Air Link Communications Ltd. (1). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Trinidad and Tobago publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Trinidad and Tobago

Operators with tracked data centers in Trinidad and Tobago, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Air Link Communications Ltd.1 / 1not publishedAir Link DC1ANSI/TIA-942-C Facility - Rated 3—
Fujitsu Caribbean (Trinidad) Ltd1 / 1not publishedBarataria Trinidad Data CentreUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility—
Informatics Ltd1 / 1not publishedInformatics Data CenterANSI/TIA-942-B Facility - Rated 3—
Telecommunications Services of Trinidad and Tobago1 / 1not publishedTelecommunications Services of Trinidad and Tobago Mausica Data CenterANSI/TIA-942-C Rated 3 (Constructed Facility)—
TSTT (Telecommunications Services of Trinidad and Tobago)1 / 1not publishedTSTT Mausica Data CentreANSI/TIA-942-B Rated 3, EPI DCOS Maturity Level 3, SOC Type 2—

Availability in Trinidad and Tobago: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Trinidad and Tobago?

By tracked sites: Air Link Communications Ltd. with 1. By published IT capacity: with 0 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Trinidad and Tobago, including some that do not sell space.

Is there colocation capacity available in Trinidad and Tobago right now?

Coloprice tracks 5 facilities here (5 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Trinidad and Tobago?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Trinidad and Tobago

One brief, several operators with capacity in Trinidad and Tobago, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.