Khazna AUH6 Masdar City
OperationalMasdar City, Abu Dhabi
Khazna AUH6 Masdar City is a data center (Uptime Tier III, design certified) in Abu Dhabi, United Arab Emirates, operated by Khazna Data Centers, with 31.8 MW of published IT capacity, currently operational, opened in 2024.
Khazna's flagship hyperscale, AI-ready data center in Masdar City, Abu Dhabi, delivering 31.8 MW of IT load.

- Operator
- Khazna Data Centers
- City
- Abu Dhabi, United Arab Emirates
- Power, MW
- 31.8 MW
- Cooling
- Air
- Uptime Tier
- III · design certified
- Opened
- 2024
- AI-ready
- Yes
Coloprice Score
51 out of 100
Class C · #3 of 60 in United Arab Emirates
- Resilience16/35
- Compliance4/20
- Transparency8/20
- Scale13/15
- Maturity10/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
With 31.8 MW of IT load, AUH6 is Khazna's flagship hyperscale facility in Masdar City, the low-carbon urban development on the edge of Abu Dhabi. Launched in February 2024, the site was pitched from the outset as AI-ready, engineered for the higher and less uniform power profiles of accelerated computing rather than classic enterprise IT. It holds an Uptime Institute Tier III design certification and achieved LEED Gold, aided by rooftop and site solar PV that supplements grid supply — a combination that fits Masdar City's sustainability mandate. AUH6 also anchors a growing campus: Khazna has broken ground next door on AUH8, which will lift the combined site to about 62 MW. As a wholesale operator majority-linked to the G42 technology group, Khazna aims AUH6 at hyperscale cloud platforms, AI companies and government workloads needing large contiguous capacity in the UAE capital region.
- ▮31.8 MW IT load hyperscale facility launched in February 2024
- ▮Located in Masdar City, Abu Dhabi's sustainable urban development
- ▮Uptime Institute Tier III design certification and LEED Gold, with on-site solar PV
- ▮AI-ready design; forms a campus with the under-construction AUH8 (combined ~62 MW)
Colocation pricing: United Arab Emirates & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Abu Dhabi
Source — Verified against operator sources · data pending on-site verification