32 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Abu Dhabi: 32 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.110
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 4 AI-ready · 734+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Abu Dhabi, United Arab Emirates | · · · | $0.110 | 32 | — |
| India | · · · | $0.109 | 167 | — |
| Germany | · · · | $0.269 | 122 | — |
| Singapore | $403 | $0.270 | 49 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Abu Dhabi's numbers describe a market being built rather than one being sold: three of six catalog facilities are operational, three are in the pipeline, and 262 MW is recorded across them against 200 MW spread over Dubai's eight sites. Average footprints are larger here, and the operator list explains why — Khazna, Microsoft and the Microsoft–G42 joint build are adding sovereign and AI capacity at campus scale, with two of the six classed AI-ready. That changes the buying process more than it changes the rate. Campus capacity at $0.110/kWh is contracted years ahead in multi-megawatt blocks, often before energisation, so there is no retail rate card to reference and the negotiable terms are delivery date and power commitment rather than price per rack. One site carries Tier III or IV certification. A buyer needing certified space to occupy this quarter should look at Dubai; a buyer needing tens of megawatts later should be here.
Frequently asked questions
How much does colocation cost in Abu Dhabi, United Arab Emirates?
No published wholesale $/kW benchmark exists for Abu Dhabi, United Arab Emirates yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 32 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Abu Dhabi, United Arab Emirates?
Commercial electricity in Abu Dhabi, United Arab Emirates is $0.110 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 32 facilities in our catalog, 4 of them announced or under construction.
Where is colocation cheaper near Abu Dhabi, United Arab Emirates?
On power alone, India ($0.109/kWh) run below Abu Dhabi, United Arab Emirates. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Abu Dhabi, United Arab Emirates market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Equinix AD1 | Equinix | — | — | Operational |
| Khazna AUH4 Mafraq | Khazna Data Centers | 30 | — | Under construction |
| Khazna AUH6 Masdar City | Khazna Data Centers | 31.8 | III | Operational |
| Khazna AUH8 Masdar City | Khazna Data Centers | — | — | Under construction |
| Microsoft Azure UAE Central Region (Abu Dhabi) | Microsoft | — | — | Operational |
| Microsoft–G42 UAE Datacenter Expansion | Microsoft / G42 | 200 | — | Announced |
| Khazna Apollo Data Center | Khazna Data Centers | 108 | III | Operational |
| Khazna IRIS 2 | Khazna Data Centers | — | III | Operational |
| Gulf Data Hub ICAD Campus | Gulf Data Hub | 16 | — | Operational |
| Khazna AUH2.1 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH2.2 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH2.3 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH2.4 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH2.5 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH2.6 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH3 | Khazna Data Centers | 9.2 | — | Operational |
| Khazna AUH3.1 | Khazna Data Centers | 5.46 | — | Operational |
| Khazna AUH5.1 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH5.2 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH5.3 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH5.4 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH5.5 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH5.6 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH5.7 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH7.1 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH7.2 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH7.3 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH7.4 | Khazna Data Centers | 6 | — | Operational |
| Khazna AUH7.5 | Khazna Data Centers | 6 | — | Operational |
| Stargate UAE | OpenAI / Oracle / Khazna (G42) | 200 | — | Under construction |
| e& (Etisalat) Data Center Khalifa City | e& (Etisalat) | 5.46 | III | Operational |
| Pure Data Centres — Abu Dhabi (Yas Island, AUH01) | Pure Data Centres Group | 20 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.