▮▮Coloprice

brightsolid Aberdeen

Operational

brightsolid Aberdeen is a data center (Uptime Tier III, design certified) in Aberdeen, United Kingdom, operated by brightsolid, currently operational.

brightsolid operates a Tier III design-certified, ISO 27001/22301/9001-accredited colocation facility on Whitemyres Avenue in Aberdeen, Scotland.

brightsolid Aberdeen — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

7 of 14 fields published · Operator? Add or correct data →

Units
Operator
brightsolid
City
Aberdeen, United Kingdom
Power, MW
—
Cooling
Air
Uptime Tier
III · design certified
Market benchmark
$213 per kW per month wholesale · United Kingdom
Index rate for the market, not this operator’s price list
Address
Whitemyres Avenue, Aberdeen AB16 6HQ, United Kingdom · Open in maps ↗
Uptime Institute Tier III Certification of Design DocumentsISO 27001ISO 22301ISO 9001

1 sources · data pending on-site verification

D

Coloprice Score

36 out of 100

Class D · #27 of 199 in United Kingdom

  • Resilience16/35
  • Compliance11/20
  • Transparency2/20
  • Scale0/15
  • Maturity7/10
How the score is calculated →
Embed score badge
brightsolid Aberdeen — Coloprice Score 36
<a href="https://coloprice.com/data-centers/uk/aberdeen/brightsolid-aberdeen/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/brightsolid-aberdeen.svg"
    alt="brightsolid Aberdeen — Coloprice Score 36" height="64">
</a>

Connectivity: 5 networks and 0 internet exchanges are present in this facility.

brightsolid's Aberdeen data centre is on Whitemyres Avenue in Aberdeen, Scotland, and is one of two colocation sites the company operates alongside its Dundee headquarters facility at Gateway House. brightsolid describes its colocation sites as purpose-built and designed to Tier III, offering multi-layered security, high-density power and a 100% uptime guarantee, with staffed engineers on site. The company states accreditation to ISO 27001, ISO 22301 and ISO 9001, and offers managed hands, managed networking, patching and backup services alongside colocation. A virtual tour of the Aberdeen facility is offered on the colocation page. The page does not publish power capacity in megawatts, floor area, rack count, cooling design or opening year for the Aberdeen site, so these fields are left empty. The Tier III reference is to design; the page does not state a constructed-facility certification.

  • ▮Located on Whitemyres Avenue, Aberdeen; one of two brightsolid colocation sites with Dundee.
  • ▮Described by the operator as designed to Tier III with a 100% uptime guarantee.
  • ▮Accredited to ISO 27001, ISO 22301 and ISO 9001 according to brightsolid.
  • ▮Managed hands, managed networking and backup services are offered alongside colocation.
  • ▮Power capacity, floor area and rack count are not published for the site.

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification